Charging for apartment buildings in the Canton of Basel-City
EV charging for underground car parks in the Canton of Basel-City60 percent subsidised.
Basel-City covers 60 percent of the cost of the basic installation until the end of 2030. We submit the application before installation begins.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Basel-City: 33.2 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Basel-City
Electric mobility in the Canton of Basel-City in figures
- Household electricity price 2026
- 33.2ct./kWh
- Median of the grid operators, excluding VAT. 5.5 ct. above the Swiss median (27.7 ct.).
- of passenger cars are electric
- 5.1%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- public charging points
- 484
- Around 7 electric cars per public charging point. Most charging happens at home and at work.
- apartment buildings
- 12,121
- 50.7% of residential buildings (Switzerland 22.7%).
- Solar power per person per year
- 264kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 634GWh
- Used so far: 9.4% (Switzerland 12.8%).
Example: underground car park with 8 electric cars in the Canton of Basel-City
- Power per car per yeararound 2,700 kWh
- Power for 8 carsaround 21,600 kWh
- Cost with grid power per yeararound CHF 7,170
- Power without load management8 × 11 kW = 88 kW
Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 33.2 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?
Calculate it for our car parkSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charging for underground car parks in the Canton of Basel-City
What applies to your car park in the Canton of Basel-City
Subsidy for private parking facilities in Basel-City
Basel-City subsidises the basic installation for charge points from July 2024 to the end of 2030. The canton covers 60% of the investment cost, at most CHF 1,300 per private parking space. For publicly accessible spaces, the limit is CHF 3,500. The subsidy covers cables, distribution and load management from the house connection onwards. The EV charger itself and any grid reinforcement are excluded.
Application before installation
We prepare the application together with the property management and submit it before installation begins. Because the programme runs until the end of 2030, there is time for careful planning. We record all parking spaces in the facility, so that the basic installation is designed for the whole car park from the start and wallboxes can be added later without new groundwork.
Condominium ownership and rented properties
For apartment buildings with an underground car park or courtyard parking, the owners in condominium ownership (STWEG) decide according to the Civil Code and their regulations. In rented properties, the landlord agrees. Load management shares the available power between all spaces, each wallbox is metered separately, and users pay for what they use.
Billing the charging electricity is one of the property management’s tasks. For this, each charge point measures its own consumption, and the data can be analysed per user. No estimates or flat rates are needed. We handle planning, installation and commissioning from one source, with our own installers.
IWB as grid operator
In Basel-City, IWB Industrielle Werke Basel supplies all three communes. The cantonal median is 33.2 ct./kWh, which is 5.5 centimes more than the Swiss median of 27.7 ct./kWh. Before installation, our electrical installer registers the system with IWB, and after installation issues the safety certificate. On request, we pre-finance the subsidy.
Grid operators
Electricity prices 2026 in the Canton of Basel-City
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Grid operator | Communes | ct./kWh |
|---|---|---|
| IWB Industrielle Werke Basel | 3 | 33.2 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How much does the Canton of Basel-City subsidise for EV chargers in an underground car park?
60% of the investment cost for the basic installation, at most CHF 1,300 per private parking space. The programme runs from July 2024 to the end of 2030.
What is part of the subsidised basic installation in Basel-City?
Cables, distribution and load management from the house connection onwards. The EV charger itself and grid reinforcement are not part of the subsidy.
Who submits the subsidy application for the car park in Basel-City?
We prepare the application with the property management and submit it before installation begins.
Must property management allow every tenant an EV charger?
There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.
Who decides on EV chargers in condominium ownership?
That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.
Is the house connection enough for several electric cars?
Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





