Skip to content

Photovoltaics in the Canton of Bern

Solar installation in the Canton of BernNotify via eBau.

In the Canton of Bern you notify roof systems, and now facade systems too, through eBau, and a building application is mostly not needed. At 29.3 ct., your own power pays off.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in the Canton of Bern: 29.3 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of Bern

Solar power in the Canton of Bern in figures

Household electricity price 2026
29.3ct./kWh
Median of the grid operators, excluding VAT. 1.6 ct. above the Swiss median (27.7 ct.).
Solar potential of the roofs per year
9,136GWh
Used so far: 11.2% (Switzerland 12.8%).
Solar power per person per year
943kWh
Switzerland: 866 kWh.
of residential buildings heat with oil or gas
50.5%
Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
of passenger cars are electric
5.2%
Switzerland: 5.5%. An EV charger turns solar power into driving power.
hailstones are to be expected about every 50 years
3.5cm
Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.

Example: 10 kWp system on a single-family home in the Canton of Bern

  • Yield per yeararound 10,000 kWh
  • Self-consumed (30%)3,000 kWh
  • Grid power saved per yeararound CHF 880
  • Federal one-off paymentCHF 3,600

Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 29.3 ct./kWh excluding VAT, plus the payment for the power you feed in. With a battery, heat pump or electric car you use more yourself. More in our guide How much does a solar system cost?

Calculate it for my roof

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

Solar installation in the Canton of Bern

What applies to your solar system in the Canton of Bern

Permit: notification via eBau

Under Art. 18a RPG, sufficiently well-integrated solar systems in building and agricultural zones do not need a building permit. In the Canton of Bern, the building permit decree (Baubewilligungsdekret, BewD) governs the notification. It is made through the eBau portal to the commune where the building stands, at the latest seven working days before building work starts (Art. 7a BewD). The commune checks the system and communicates its decision through eBau.

Since 1 January 2026 the notification procedure (Meldeverfahren) also applies to facade systems, if they meet the criteria of federal law and the cantonal information sheet. This is interesting for winter power, because steeply mounted modules produce more in winter.

A building permit is still needed for cultural monuments and buildings worthy of protection, and for systems that do not meet the criteria. This also applies in protected townscape areas and historic core zones, which are regulated differently from commune to commune. In cities such as Bern, Thun or Biel/Bienne, a look at the zoning plan is therefore part of the planning. We clarify this for your address.

Subsidies in the Canton of Bern

The Canton of Bern does not directly subsidise photovoltaics. It subsidises solar thermal systems as well as complete renovations and energy-efficient new builds. For your photovoltaic system, the federal one-off payment (Einmalvergütung, EIV) through Pronovo applies. Since 1 April 2025 there has been no base amount. For add-on systems under 30 kWp the federal government pays CHF 360 per kWp, for integrated systems CHF 400 per kWp.

Some communes and energy suppliers have their own programmes. When preparing the quote, we check what applies to your address, and we name no amounts that we cannot back up.

For tax purposes, investments in energy saving and environmental protection on existing buildings are deductible. The tax office explicitly names the photovoltaic system there, and since the 2024 tax year also for new builds.

Grid operator and power price

In the Canton of Bern, BKW supplies 210 of the 295 communes, at 27.7 ct./kWh in the household tariff (H4, excluding VAT). The cantonal median is 29.3 ct., above the Swiss median of 27.7 ct. Other utilities are higher, for example Evolon at 34.0 ct., Elektra Jegenstorf at 30.8 ct. or IBI Interlaken at 29.2 ct. If you pay more, you save more with every kilowatt hour you use yourself.

The grid operator pays for the electricity you feed in. The rate differs from one utility to the next. We calculate with the tariff of your utility.

Solar obligation since 2026

Since 1 January 2026, new buildings and extensions must be fitted with solar systems on at least ten percent of the eligible building area. For existing buildings, there is a duty to notify for comprehensive roof renovations covering 50% or more of the roof area.

Grid operators

Electricity prices 2026 in the Canton of Bern

What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), centimes per kWh excluding VAT
CommuneGrid operatorct./kWh
BernEnergie Wasser Bern33.3
Biel/BienneEnergie Service Biel/Bienne (ESB)29.5
ThunEnergie Thun AG29.3
KönizBKW Energie AG28.1
OstermundigenBKW Energie AG27.7
BurgdorfLocalnet AG31.9
SteffisburgNetZulg AG29.9
LyssEvolon AG34.0
LangenthalIB Langenthal AG30.4
Muri bei BernBKW Energie AG27.7
SpiezBKW Energie AG27.7
MünsingenInfraWerkeMünsingen (IWM)31.9
BelpEnergie Belp AG36.3
WorbBKW Energie AG28.2
ZollikofenBKW Energie AG27.7

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

Do I need a building permit for a solar system in the Canton of Bern?

Sufficiently well-integrated systems on roofs, and since 1 January 2026 under certain conditions on facades too, do not need a building permit. They are notified through eBau at the latest seven working days before building work starts (Art. 7a BewD). For cultural monuments and buildings worthy of protection, a building permit is still needed.

Does the Canton of Bern subsidise photovoltaics?

The Canton of Bern does not directly subsidise photovoltaics. The federal government pays the one-off payment through Pronovo. Communes and energy suppliers sometimes have their own programmes, which we check for your address when preparing the quote.

Can I deduct a solar system from my taxes in the Canton of Bern?

Investments in energy saving and environmental protection on existing buildings are deductible, and this includes the photovoltaic system. Since the 2024 tax year this also applies to new builds. The tax office's information sheet 5 is the authoritative source.

Is there a solar obligation in the Canton of Bern?

Since 1 January 2026, new buildings and extensions must be fitted with solar systems covering at least ten percent of the eligible building area. For existing buildings, a duty to notify applies for comprehensive roof renovations. We explain what applies to your project.

How large does my roof need to be for a solar system?

A system is worthwhile from about 20 m². A single-family home usually has room for 8 to 15 kWp, which is about 40 to 75 m² of module area. We measure how much fits on your roof during the site visit.

How long does it take from enquiry to finished system?

The site visit usually takes place within a week, and the quote follows within 72 hours. The installation itself depends on the size of the system; for a single-family home it usually takes about a week. In between come the notification, the grid operator and the delivery of materials.

How long until a solar system has paid for itself?

That depends on the electricity price, self-consumption and the feed-in tariff of your grid operator. In the quote, we calculate the payback with your figures, not with average values.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

Locations

Solar installation in your commune

Communes in the Canton of Bern

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager