Skip to content

Ground-source heat pumps across German-speaking Switzerland

Ground-source heat pumpHeat from the ground.

We clear the permit, the drilling and the heating system, and combine the heat pump with your solar system. The binding quote follows within 72 hours.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Subsidies pre-financed on request

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Ground-source heat pump

Ground-source heat pump: when it suits you

A ground-source heat pump uses the heat of the ground. One or more pipes reach down into the subsoil. A fluid picks up heat there and carries it to the heat pump in the house. From a few metres down, the temperature stays almost constant all year.

That is why it works especially evenly in winter, just when the outside air is cold. Together with a solar system, it reduces the electricity you draw from the grid.

You will find an overview of all systems under heat pump. This page is about the borehole: when it is possible, what it costs and how the drilling works.

How does a ground-source heat pump work?

A probe is placed in a borehole: a closed pipe loop filled with water and antifreeze. The mixture picks up heat from the ground. The heat pump lifts it to the temperature level of your heating system.

Because the source temperature is constant, the seasonal performance factor (SPF, JAZ) is higher than with air-to-water units. Typical values are around 4 to 5. So for every kilowatt-hour of electricity, you get correspondingly more heat. Electricity demand falls, and so does the need for winter electricity, which the solar system cannot supply.

May I drill a borehole? Permit and water protection

Boreholes need a permit. Drilling reaches into the ground and can endanger groundwater. So the canton decides, following the water protection rules.

  • Not allowed everywhere: In groundwater protection zones and areas, boreholes are usually banned or subject to conditions.
  • Cantonal maps: The cantons show online where boreholes are allowed, allowed with conditions or ruled out.
  • Boundary distances: Minimum distances to neighbouring plots, buildings and pipes must be kept.
  • The permit takes time: Depending on the canton, it takes weeks to months. This is the part that affects planning most.

We check the plot before the quote and tell you openly whether a borehole is possible. If not, we show you the alternative, usually an air-to-water heat pump.

How does the drilling work?

A specialist drilling firm does the drilling. We coordinate it and remain your contact.

  1. Drilling rig: It drives onto the property and is set up.
  2. Drilling: Usually one to two days per borehole.
  3. Placing and backfilling the probe: The borehole is sealed.
  4. Pressure test and connection: The pipes are routed to the house and tested.
  5. Documentation: The drilling firm supplies the canton with the required documents.

There is noise, mud and a machine on your property. The garden is restored afterwards. Expect the area around the drilling site to be unusable for a few days.

Ground-source or air: which suits better?

Ground-source heat pump Air-to-water heat pump
Investment higher lower
Efficiency in winter high, steady drops with the cold
Noise outdoors none may matter, depending on the site
Permit always needed, not possible everywhere usually simpler
Space access for the drilling rig standing area for the unit
Older building good, even with a higher flow temperature good, once the flow temperature is checked

Neither option is always the right one. For many houses, air-to-water is more economical. For larger buildings, high heat demand, or where noise is an issue, the borehole is worthwhile. We calculate both for your house.

Ground-source heat pump with solar system

The borehole reduces electricity demand in winter. The solar system covers part of it, mainly in the shoulder seasons. Together they reduce what you draw from the grid.

  • Hot water can be heated during sunny hours.
  • The controls coordinate the heat pump and the solar system.
  • A battery storage unit shifts solar power into the evening.
  • Less winter electricity from the grid means less dependence on the electricity price.

Who benefits from a borehole?

A borehole pays off mainly in these cases:

  • Higher heat demand: In large houses and apartment buildings, the higher efficiency has a bigger effect.
  • Older building with a higher flow temperature: The steady source temperature helps here.
  • Little space or noise problems outdoors: There is no outdoor unit.
  • Long-term planning: The probe itself lasts many decades. The heat pump can be replaced later without drilling again.

It is not suitable if water protection rules ban the drilling, if there is no access for the drilling rig, or if the cost is too high in relation to the heat demand. We clarify this before the quote.

How is the borehole sized?

The length of the probes depends on the heat demand of the house and on the ground. Probes that are too short cool the ground down, and efficiency drops. Probes that are too long cost more than necessary.

So we calculate the heat demand carefully before the drilling firm sets the length. For larger systems, several probes with spacing between them are needed. Keeping to the boundary distances is also part of the planning.

What does a ground-source heat pump cost?

For a single-family home, the total cost is roughly CHF 45,000 to 70,000, before subsidies. This is a guide, not a price. The drilling makes up a large part of it.

What determines the price:

  • Metres drilled: More heating output means more probe length.
  • Ground: Hard rock is drilled more slowly than loose ground.
  • Access: Narrow access roads make the drilling longer and more expensive.
  • Removal: Oil tank, chimney and boiler.
  • Heating system and electrics: Depending on condition, adjustments are needed.

You receive the binding quote within 72 hours of the site visit, covering the drilling, subsidies and running costs.

Subsidies

There are subsidies for ground-source heat pumps too, mostly through the cantonal buildings programme, in some cases also from communes and energy suppliers. The conditions differ by canton.

Often the application must be submitted before work starts. We submit the subsidy application for replacing your heating system as part of the service. On request, we pre-finance the subsidies.

How your project runs

  1. Enquiry and site visit: We check the house, heating, plot and access. Free of charge.
  2. Water protection check: Is drilling allowed at your address?
  3. Quote within 72 hours: binding.
  4. Permit and subsidy application: We submit both.
  5. Drilling: by the drilling firm, coordinated by us.
  6. Installation: Heat pump, storage tank, hydraulics, electrics, removal of the old heating.
  7. Commissioning: We set everything up and explain how to use it.

From planning to commissioning, everything stays in one hand.

Ground-source heat pump in your region

Our locations are in Zumikon ZH and Lachen SZ. We work across German-speaking Switzerland. The cantons regulate differently where boreholes are allowed. We know the maps and procedures and tell you at the site visit what applies at your address.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

May I drill a borehole on my property?

That depends on water protection rules. In groundwater protection zones and other areas, drilling is restricted or banned. The cantons publish maps showing where boreholes are allowed. We check your plot before the quote.

How deep is the drilling?

That depends on the heating output and the ground. Depths of a few dozen metres up to around 200 metres are usual, split across several boreholes if needed. The drilling firm sets the exact depth from the heating output and the geology.

How long does the drilling take?

One borehole is usually drilled in one to two days. With delivery, set-up and connection to the house, allow a week on site. The permit beforehand takes longer than the drilling itself.

How much space does the drilling rig need?

A drilling rig needs access and a standing area of a few metres. For narrow plots there are smaller rigs. We clarify access at the site visit.

Is a ground-source heat pump quieter than an air-to-water heat pump?

Yes. There is no outdoor unit with a fan. The unit sits in the boiler room, and the noise protection question largely falls away.

Can I add a solar system later?

Yes. Ideally we plan both together, so that the electricity meter, supply line and controls fit. Adding it later is possible. We can also connect an existing system.

Can I cool in summer with the borehole?

With so-called passive cooling, this works to a limited extent with underfloor heating. It is not air conditioning, but it takes the edge off the heat in the house. At the site visit we tell you whether it is worthwhile for your building.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager