Skip to content

Photovoltaics in German-speaking Fribourg

Solar installation in German-speaking FribourgNotify the commune.

In the Sense district you notify the commune of your system at the latest 30 days before work starts. Groupe E supplies the power everywhere, at 27.3 ct. per kWh.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in German-speaking Fribourg: 27.3 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in German-speaking Fribourg

Solar power in German-speaking Fribourg in figures

Household electricity price 2026
27.3ct./kWh
Median of the communes, excluding VAT. 0.4 ct. below the Swiss median (27.7 ct.).
Solar potential of the roofs per year
505GWh
Used so far: 11.7% (Switzerland 12.8%).
Solar power per person per year
1,236kWh
Switzerland: 866 kWh.
of residential buildings heat with oil or gas
25.4%
Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
of passenger cars are electric
4.7%
Switzerland: 5.5%. An EV charger turns solar power into driving power.
hailstones are to be expected about every 50 years
4.0cm
Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.

Example: 10 kWp system on a single-family home in German-speaking Fribourg

  • Yield per yeararound 10,000 kWh
  • Self-consumed (30%)3,000 kWh
  • Grid power saved per yeararound CHF 820
  • Federal one-off paymentCHF 3,600

Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 27.3 ct./kWh excluding VAT, plus the payment for the power you feed in. With a battery, heat pump or electric car you use more yourself. More in our guide How much does a solar system cost?

Calculate it for my roof

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

Solar installation in German-speaking Fribourg

What applies to your solar system in German-speaking Fribourg

Permit: notification to the commune

Under Art. 18a RPG, sufficiently well-integrated solar systems on roofs in building and agricultural zones do not need a building permit. The Canton of Fribourg implements this in its spatial planning and building regulations (Raumplanungs- und Baureglement, RPBR). Under Art. 87 para. 3 RPBR, such systems are notified to the commune at the latest 30 days before work starts. Since 1 January 2026, the relaxation under federal law (Art. 32a and 32abis RPV) also applies to sufficiently well-integrated facade systems.

On cultural heritage buildings and in landscapes of cantonal or national importance, a building permit is still needed. The canton provides the notification form. Before the quote, we check whether your building is affected, and we file the notification with your commune.

Subsidies in the Canton of Fribourg

The federal government pays the one-off payment (Einmalvergütung, EIV) through Pronovo. Since 1 April 2025 there has been no base amount, and add-on systems under 30 kWp receive CHF 360 per kWp. We file the application. On request, we pre-finance the subsidy.

The Canton of Fribourg does not directly subsidise photovoltaics. According to the cantonal energy office, subsidies for photovoltaics run through Pronovo, while the canton itself supports solar thermal systems. The Fribourg buildings programme covers other measures. Some communes offer their own programmes, and we clarify that for your address.

According to the cantonal tax office’s information sheet, the costs of a photovoltaic system on an existing building can be deducted. For new builds and building extensions, no deduction is possible. Contributions from third parties are taxable as other income.

Grid operator and power price

Groupe E supplies all 15 communes in the Sense district. In 2026 the median is 27.3 ct. per kWh excluding VAT, slightly below the Swiss median of 27.7 ct. The power price is therefore average, so what matters most is how much solar power you use yourself.

The grid operator pays for the electricity you feed in. The rate differs from one utility to the next, and we calculate with the tariff of your utility.

Buildings and heating

In German-speaking Fribourg, a good half of residential buildings heat with a heat pump, which is a high share. If you already have a heat pump, you use solar power directly for heating. A battery storage system or an EV charger raises self-consumption further.

Grid operators

Electricity prices 2026 in German-speaking Fribourg

What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), median of the communes supplied, centimes per kWh excluding VAT
Grid operatorCommunesct./kWh
Groupe E SA1527.3

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

Do I need a building permit for a solar system in German-speaking Fribourg?

Sufficiently well-integrated systems do not need a building permit. They are notified to the commune at the latest 30 days before work starts. On cultural heritage buildings and in landscapes of cantonal or national importance, a building permit is still needed.

Is there a subsidy for photovoltaics in the Canton of Fribourg?

The canton pays no subsidy of its own for photovoltaics, which runs through the federal one-off payment from Pronovo. The Fribourg buildings programme supports other measures, such as solar thermal systems. Individual communes may have their own contributions.

Can I deduct a solar system from my taxes in the Canton of Fribourg?

For photovoltaics on an existing building, the investment costs can be deducted, according to the tax office's information sheet. There is no deduction for new builds and extensions. Subsidies must be taxed as other income.

Who supplies the power in German-speaking Fribourg?

In all 15 communes of the Sense district, Groupe E is the grid operator. In 2026 the median is 27.3 ct. per kWh excluding VAT. We register your system with them and calculate with your feed-in tariff.

How large does my roof need to be for a solar system?

A system is worthwhile from about 20 m². A single-family home usually has room for 8 to 15 kWp, which is about 40 to 75 m² of module area. We measure how much fits on your roof during the site visit.

How long does it take from enquiry to finished system?

The site visit usually takes place within a week, and the quote follows within 72 hours. The installation itself depends on the size of the system; for a single-family home it usually takes about a week. In between come the notification, the grid operator and the delivery of materials.

How long until a solar system has paid for itself?

That depends on the electricity price, self-consumption and the feed-in tariff of your grid operator. In the quote, we calculate the payback with your figures, not with average values.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

Locations

Solar installation in your commune

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager