For architects and developers of new builds
Solar in new buildsOn plan and on schedule.
We deliver planning data early, coordinate with roofer, plumber and electrician, and install on the agreed date. Quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Subsidies pre-financed on request
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
For architects and developers
What architects and developers want to know about solar in new builds
In a new build, the first plans decide a lot. What is not planned in now costs twice as much later: conduits are missing, the meter space is too small, the roof is already covered. If you involve solar early, you save on interfaces, scaffolding costs and discussions on site.
We like working with architects. You want reliable data, clear dates and a solution that fits the design. We start with a free site visit or, if nothing is built yet, a discussion based on the plans. The binding quote follows within 72 hours.
The worries in a new build
Schedule: Installation has to fit the construction sequence. If the system is delayed, the interior finishing or the final acceptance is held up.
Plans: On paper, the system looks different from on the roof. Connections, penetrations and cable routes must be settled early.
Appearance: The roof shapes the house. It should look calm, even with solar modules.
Interfaces: Roofer, plumber, electrician, heating engineer and solar installer all work on the same house. Every open question between them costs time.
In-roof: the roof as a solar system
With an in-roof solar system, the modules replace the roof tiles and form the waterproof layer themselves. The roof looks like one flush surface, with no mounting structure above the tiles. In a new build this is the cheapest moment, because the roof is not yet covered.
One thing applies: in-roof is usually more expensive per kWp than on-roof. The tiles and part of the roofing work are no longer needed, so it is better to compare the extra cost against a tiled roof. We calculate this for you in the quote. If you wish, we set on-roof and in-roof side by side. The basics of every system are described on the solar system page.
Planning data when you need it
For your plans, we supply what you need:
- Module size, layout and coverage of the roof surface
- Connection details for ridge, eaves, verge and penetrations
- Weight and loads for the structural calculations
- Cable routes and space needed for the inverter and meter cabinet
- Yield forecast for your client
The earlier we can work with the roof plan and the electrical concept, the fewer changes are needed later. We adapt the scope of what we supply to your stage of planning.
Installation to your schedule
We coordinate installation with the roofer, plumber and electrician. With an in-roof system, the roof build-up and the installation are closely linked, so we plan the sequence together. Our own installers carry out the work. That means a fixed date and a fixed contact person.
Design and townscape
Whether a system gets approved often depends on how it looks on the roof. In historic core zones and for protected buildings, the commune (municipality) decides case by case. A flush, uniformly black in-roof system usually fits in better than a visible on-roof structure. We find out what is possible for your address and prepare the documents for the notification or building application, so that you can include them in your submission.
For façades, carports or a system on a garage roof, design matters too. Show us your design and we will tell you what is technically feasible and what it costs.
Preparing the underground car park
Even if there is no electric car in the house today, the underground car park can be prepared cheaply during the shell construction. Conduits, cable trays and space in the distribution board cost little now. Breaking open walls later is expensive. Wallboxes and load management follow later as needed. More on this under EV charging in underground car parks.
Subsidies and notification
For the solar system there is the federal one-off payment (Einmalvergütung, EIV) from Pronovo, plus further contributions depending on canton and commune. We register the system and submit the subsidy applications. For roofs in the building zone, a notification to the commune is usually enough (notification procedure, Meldeverfahren). For protected buildings a building permit is required. We clarify this early so that it does not slow down your schedule.
How we work together
- First conversation: plans, dates, wishes of the client.
- Site visit or plan review: free.
- Quote in 72 hours: binding, with on-roof and in-roof compared if you wish.
- Coordination with the trades: roof build-up, connections, dates.
- Notification and grid operator: we submit the documents.
- Installation and acceptance: our own installers, in the agreed time slot.
Enter the postcode of the building site in the appointment form. We will get in touch and arrange the conversation or the site visit.
For architects and developers
Our services for you
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Which documents do you need from us for planning?
Roof plans, sections, details of the roof build-up and insulation, and the electrical concept. The earlier we see these, the better the system fits the design.
At what stage of the construction process should we involve you?
As early as possible, ideally in the preliminary design phase. Roof shape, cable routes and meter location can then be allowed for at no extra cost.
Can the system be matched to the building in colour and design?
Usually yes. A uniformly black in-roof system looks calm. For special requirements we check the module format and edge details, and show samples on site.
How do you coordinate with the other trades?
We go through the roof build-up, connections and schedule with the roofer, plumber and electrician. We settle open points in writing before installation.
Can we prepare the underground car park for EV chargers now?
Yes, and it is cheaper than doing it later. Conduits, cable trays and space in the distribution board are planned in during the shell construction. The wallboxes follow later as needed.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





