Photovoltaics in the Canton of Appenzell Ausserrhoden
Solar installation in the Canton of Appenzell AusserrhodenWith a cantonal top-up.
Ausserrhoden tops up the federal one-off payment, by up to 50% since September 2025. For roof systems, a notification is often enough.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Appenzell Ausserrhoden: 28.7 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Appenzell Ausserrhoden
Solar power in the Canton of Appenzell Ausserrhoden in figures
- Household electricity price 2026
- 28.7ct./kWh
- Median of the grid operators, excluding VAT. 1.0 ct. above the Swiss median (27.7 ct.).
- Solar potential of the roofs per year
- 428GWh
- Used so far: 18.7% (Switzerland 12.8%).
- Solar power per person per year
- 1,310kWh
- Switzerland: 866 kWh.
- of residential buildings heat with oil or gas
- 48.2%
- Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
- of passenger cars are electric
- 4.9%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- hailstones are to be expected about every 50 years
- 3.5cm
- Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.
Example: 10 kWp system on a single-family home in the Canton of Appenzell Ausserrhoden
- Yield per yeararound 10,000 kWh
- Self-consumed (30%)3,000 kWh
- Grid power saved per yeararound CHF 860
- Federal one-off paymentCHF 3,600
Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 28.7 ct./kWh excluding VAT, plus the payment for the power you feed in. With a battery, heat pump or electric car you use more yourself. More in our guide How much does a solar system cost?
Calculate it for my roofSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Solar installation in the Canton of Appenzell Ausserrhoden
What applies to your solar system in Appenzell Ausserrhoden
Permit: notification on the cantonal form
Under Art. 18a RPG, sufficiently well-integrated solar systems on roofs in building and agricultural zones do not need a building permit. Appenzell Ausserrhoden has published a guide to solar systems for this. It sets out when a notification is enough and when a building permit is still required. The notification is made on the official cantonal form, available at ar.ch/baugesuche.
Stricter rules apply in protection zones and for protected buildings. Before the quote, we check which category your building falls into, and we file the documents with your commune.
Subsidies in the Canton of Appenzell Ausserrhoden
The federal government pays the one-off payment (Einmalvergütung, EIV) through Pronovo. Since 1 April 2025 there has been no base amount, and add-on systems under 30 kWp receive CHF 360 per kWp. We file the application. On request, we pre-finance the subsidy.
Ausserrhoden also subsidises photovoltaics itself. For systems of 2 kWp or more, the canton pays a contribution on top of the federal one-off payment. For systems commissioned between 1 January 2022 and 31 August 2025 it was at most 100%, and from 1 September 2025 it is at most 50%. The contribution is capped at CHF 100,000 per project. Pure renovations of existing systems are excluded.
You submit the application only after commissioning, once the federal decision has become legally binding. The Office for the Environment (Amt für Umwelt) receives it through the building programme portal.
Grid operator and power price
In 2026 the cantonal median is 28.7 ct. per kWh excluding VAT, only slightly above the Swiss median of 27.7 ct. In 14 of the 20 communes, SAK (St. Gallisch-Appenzellische Kraftwerke) supplies at 28.7 ct. There are also small utilities, for example Elektrizitätswerk Heiden at 32.8 ct. and Elektrokorporation Wald - St. Peterzell at 26.0 ct.
The grid operator pays for the electricity you feed in. The rate differs from one utility to the next, and we calculate with the tariff of your utility.
Altitude and buildings
Ausserrhoden lies higher than the Swiss Plateau, and in winter snow can lie on the modules. We choose the tilt and the mounting structure to suit the snow load and the roof. About 72% of residential buildings date from before 1980, so at the site visit we check the condition of the roof. A heat pump is a good fit if you are replacing your heating system.
Grid operators
Electricity prices 2026 in the Canton of Appenzell Ausserrhoden
What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.
| Grid operator | Communes | ct./kWh |
|---|---|---|
| St. Gallisch-Appenzellische Kraftwerke AG | 14 | 28.7 |
| Elektra Korporation EKW | 1 | 29.0 |
| Elektra Walzenhausen | 1 | 30.5 |
| Elektrizitätswerk Heiden AG | 1 | 32.8 |
| Elektrokorporation Wald - St. Peterzell | 1 | 26.0 |
| Hydrantenkorporation & Elektraversorgung Schönengrund | 1 | 29.5 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Do I need a building permit for a solar system in Appenzell Ausserrhoden?
For sufficiently well-integrated roof systems, a notification on the cantonal form is enough. In protection zones and for protected buildings, a building permit is needed. The cantonal guide sets out which case applies, and we clarify that for your building.
Is there a cantonal subsidy for photovoltaics in Appenzell Ausserrhoden?
Yes. For systems of 2 kWp or more, the canton pays a contribution on top of the federal one-off payment. For systems commissioned from 1 September 2025 it is at most 50% of the one-off payment, up to a maximum of CHF 100,000 per project.
When do I apply for the cantonal subsidy in Appenzell Ausserrhoden?
The application goes in after commissioning, once the decision on the federal one-off payment has become legally binding. We prepare the documents and submit the application for you.
Which grid operator supplies Appenzell Ausserrhoden?
In 14 of the 20 communes it is SAK. There are also several small utilities such as EW Heiden or Elektra Walzenhausen. We calculate with the tariff of your utility.
How large does my roof need to be for a solar system?
A system is worthwhile from about 20 m². A single-family home usually has room for 8 to 15 kWp, which is about 40 to 75 m² of module area. We measure how much fits on your roof during the site visit.
How long does it take from enquiry to finished system?
The site visit usually takes place within a week, and the quote follows within 72 hours. The installation itself depends on the size of the system; for a single-family home it usually takes about a week. In between come the notification, the grid operator and the delivery of materials.
How long until a solar system has paid for itself?
That depends on the electricity price, self-consumption and the feed-in tariff of your grid operator. In the quote, we calculate the payback with your figures, not with average values.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
Solar installation in your commune
Communes in the Canton of Appenzell Ausserrhoden
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





