Photovoltaics in the Canton of St. Gallen
Solar installation in the Canton of St. GallenNotify the commune.
In the Canton of St. Gallen the power price of 29.8 ct./kWh is above the Swiss median, and you notify roof systems only to the commune. Free site visit, quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of St. Gallen: 29.8 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of St. Gallen
Solar power in the Canton of St. Gallen in figures
- Household electricity price 2026
- 29.8ct./kWh
- Median of the grid operators, excluding VAT. 2.1 ct. above the Swiss median (27.7 ct.).
- Solar potential of the roofs per year
- 4,072GWh
- Used so far: 17.0% (Switzerland 12.8%).
- Solar power per person per year
- 1,170kWh
- Switzerland: 866 kWh.
- of residential buildings heat with oil or gas
- 49.5%
- Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
- of passenger cars are electric
- 5.3%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- hailstones are to be expected about every 50 years
- 3.5cm
- Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.
Example: 10 kWp system on a single-family home in the Canton of St. Gallen
- Yield per yeararound 10,000 kWh
- Self-consumed (30%)3,000 kWh
- Grid power saved per yeararound CHF 890
- Federal one-off paymentCHF 3,600
Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 29.8 ct./kWh excluding VAT, plus the payment for the power you feed in. With a battery, heat pump or electric car you use more yourself. More in our guide How much does a solar system cost?
Calculate it for my roofSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Solar installation in the Canton of St. Gallen
What applies to your solar system in the Canton of St. Gallen
Permit: notification to the commune
At federal level, Art. 18a of the Spatial Planning Act and Art. 32a and 32b of the Spatial Planning Ordinance set out when a notification is enough. The Canton of St. Gallen provides its own notification form for this. We fill it in and submit it with the attachments to the building permit authority of the commune where the building stands. The commune checks the details and communicates the result within 30 days. For the fire protection permit, the submission also goes through the commune. The responsible body is the cantonal building insurance of St. Gallen (Gebäudeversicherung St.Gallen).
For cultural and natural monuments of cantonal or national importance, a building permit is always needed. For protected townscape areas and protected individual objects, the canton has clarified the permit practice together with the communes. It works with a traffic-light system: in green areas, solar systems are relatively unproblematic, while in red areas, the most sensitive roofscapes, they are possible only in exceptional cases. Whether and when the new practice applies depends on your commune. We clarify this before the quote.
Subsidies in the Canton of St. Gallen
The federal government pays the one-off payment (Einmalvergütung, EIV) through Pronovo. Since 1 April 2025 there has been no base amount. It is CHF 360 per kWp for add-on systems under 30 kWp and CHF 400 per kWp for integrated systems.
We are not aware of a cantonal subsidy programme for photovoltaic systems. Many communes and regions in the canton do have their own programme, which differs from commune to commune and can change. Energieagentur St.Gallen offers a subsidy calculator for this. We check the current position for your commune and apply for the contributions.
On taxes: under federal law (Art. 9 para. 3 StHG), investments in renewable energy on existing buildings are treated like maintenance costs, as far as they are deductible for the direct federal tax. The cantonal tax office sets the details. We recommend clarifying your project beforehand with the tax office or your tax adviser.
Grid operator and power price
In the Canton of St. Gallen, SAK (St. Gallisch-Appenzellische Kraftwerke) supplies 15 communes at 29.3 ct./kWh. There are also the St.Galler Stadtwerke (30.6 ct.), Regionalwerk Toggenburg (24.8 ct.) and several village utility corporations. The cantonal median is 29.8 ct./kWh excluding VAT (household category H4, ElCom 2026), which is 2.1 ct. above the Swiss median of 27.7 ct.
Your grid operator pays for the electricity you feed in. The rate differs from one utility to the next, so we calculate with the tariff of your utility.
Building stock in the Canton of St. Gallen
Around 59% of residential buildings in the canton were built before 1980, and about half are still heated with fossil fuels. If you install a heat pump, you need more electricity and benefit especially from your own solar power. We plan the two so that they fit together.
Grid operators
Electricity prices 2026 in the Canton of St. Gallen
What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| St. Gallen | St.Galler Stadtwerke | 30.6 |
| Rapperswil-Jona | Elektrizitätswerk Jona-Rapperswil AG | 23.1 |
| Wil | Technische Betriebe Wil | 31.1 |
| Gossau | Stadtwerke Gossau | 27.9 |
| Uzwil | St. Gallisch-Appenzellische Kraftwerke AG | 29.7 |
| Buchs | Elektrizitäts- und Wasserwerk der Stadt Buchs (EWB) | 29.6 |
| Altstätten | Technische Betriebe Altstätten | 31.2 |
| Flawil | Technische Betriebe Flawil (TBF) | 27.9 |
| Widnau | Politische Gemeinde Widnau, Elektra / Stromversorgung | 27.1 |
| Rorschach | Technische Betriebe, Stadt Rorschach | 26.4 |
| Eschenbach | St. Gallisch-Appenzellische Kraftwerke AG | 29.3 |
| Wittenbach | St.Galler Stadtwerke | 29.5 |
| Kirchberg | rwt Regionalwerk Toggenburg AG | 25.1 |
| Goldach | Technische Betriebe Goldach | 30.5 |
| Mels | Politische Gemeinde Mels, Elektrizitäts- & Wasserwerk | 26.9 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Do I need a building permit for a solar system in the Canton of St. Gallen?
For sufficiently well-integrated systems on roofs, a notification to the commune is enough in the Canton of St. Gallen. Free-standing systems, systems along roads, and systems on protected buildings or in sensitive townscapes still need a permit. We clarify that for your plot.
How long does the check of the notification take in the Canton of St. Gallen?
The commune checks the notification and tells you the result within 30 days. After that, we can start installation, provided no permit is required.
Does the Canton of St. Gallen subsidise photovoltaic systems?
We are not aware of a cantonal subsidy programme for photovoltaic systems. You receive the federal one-off payment, and many communes in the canton have their own programme. We clarify whether your commune is one of them when preparing the quote.
Does a solar system pay off in the Canton of St. Gallen at a power price of 29.8 ct.?
The cantonal median is 2.1 ct. above the Swiss median. The higher the power price, the more you save with every kilowatt hour you use yourself. We calculate with your consumption and the tariff of your utility.
How large does my roof need to be for a solar system?
A system is worthwhile from about 20 m². A single-family home usually has room for 8 to 15 kWp, which is about 40 to 75 m² of module area. We measure how much fits on your roof during the site visit.
How long does it take from enquiry to finished system?
The site visit usually takes place within a week, and the quote follows within 72 hours. The installation itself depends on the size of the system; for a single-family home it usually takes about a week. In between come the notification, the grid operator and the delivery of materials.
How long until a solar system has paid for itself?
That depends on the electricity price, self-consumption and the feed-in tariff of your grid operator. In the quote, we calculate the payback with your figures, not with average values.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
Solar installation in your commune
Communes in the Canton of St. Gallen
- Solar installation in St. Gallen
- Solar installation in Rapperswil-Jona
- Solar installation in Wil
- Solar installation in Gossau
- Solar installation in Uzwil
- Solar installation in Buchs
- Solar installation in Altstätten
- Solar installation in Flawil
- Solar installation in Widnau
- Solar installation in Rorschach
- Solar installation in Eschenbach
- Solar installation in Wittenbach
- Solar installation in Kirchberg
- Solar installation in Goldach
- Solar installation in Mels
- Solar installation in Oberriet
- Solar installation in Wattwil
- Solar installation in Gaiserwald
- Solar installation in Au
- Solar installation in Rorschacherberg
- Solar installation in Grabs
- Solar installation in Thal
- Solar installation in Uznach
- Solar installation in Diepoldsau
- Solar installation in Bad Ragaz
- Solar installation in Oberuzwil
- Solar installation in St. Margrethen
- Solar installation in Sargans
- Solar installation in Neckertal
- Solar installation in Sennwald
- Solar installation in Walenstadt
- Solar installation in Gommiswald
- Solar installation in Wartau
- Solar installation in Sevelen
- Solar installation in Flums
- Solar installation in Bütschwil-Ganterschwil
- Solar installation in Ebnat-Kappel
- Solar installation in Balgach
- Solar installation in Vilters-Wangs
- Solar installation in Kaltbrunn
- Solar installation in Rebstein
- Solar installation in Zuzwil
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





