For homeowners across German-speaking Switzerland
Energy for your homeOne system, one quote.
Solar system, battery storage, EV charger and heat pump work together when they are planned together. We visit you and calculate with your figures. Quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Subsidies pre-financed on request
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
For homeowners
What homeowners want to know before deciding
Owning a house means living with energy questions. The heating is old, electricity prices are rising, and perhaps an electric car is coming soon. And every provider sells only its own part: one the solar system, another the heat pump, a third the wallbox.
We see it as one system. Solar system, battery storage, EV charger and heat pump all use the same electricity. When they are matched to each other, more of your own solar power stays in the house. That is why every project with us starts with a free site visit.
What matters to homeowners
From conversations with homeowners we know three worries: the cost, the subsidies and trust.
Cost: A price without a site visit is an estimate. After the visit you receive a binding quote within 72 hours. It states capacity, yield, subsidies and payback, calculated with your consumption.
Subsidies: The federal one-off payment (Einmalvergütung, EIV) from Pronovo and, depending on canton and commune, further contributions help with the investment. We submit the applications. On request, we pre-finance the subsidy. For tax too, in most cantons you can deduct the investment in an existing house.
Trust: You get a site visit instead of a quote based on a satellite image. Our own installers build the system. We are a member of Swissolar, the Swiss solar energy association. And from the first conversation to commissioning, you have one fixed contact person.
The solar system as the foundation
It all starts with the roof. A single-family home usually has room for 8 to 15 kWp. We check orientation, pitch, shade and the condition of the roof covering. If the roof refurbishment is due anyway, we plan both together. You will find everything important under solar systems and photovoltaics.
Without further measures, a household uses only part of its own electricity directly, and the grid operator pays for the rest at a lower tariff. This is exactly where the other building blocks come in.
Battery, EV charger and heat pump
- Battery storage: Power from midday covers the evening. More under battery storage.
- EV charger: An electric car needs around 2,000 to 3,000 kWh a year. With an EV charger that detects surplus power, you charge with sunshine.
- Heat pump: It heats and makes hot water using electricity. Together with the solar system, your energy costs fall the most. You will find information on the heat pump on its service page.
- Controls: An energy manager switches on the boiler, wallbox and heat pump when the sun is shining.
You do not have to buy everything at once. What matters is that we plan from the start so that later building blocks can be added without rebuilding. If you start with the solar system today and buy an electric car in three years, you should not have to open up walls again.
Backup power: lights on during a grid outage
A normal solar system switches off during a grid outage for safety reasons. If you do not want that, choose a battery that supports backup power. It keeps important loads running, for example the fridge, lights, internet and the heating controls.
How much backup power you need is a matter of preference. It is worth settling this before building, because the meter cabinet has to be prepared for it. At the site visit we discuss which loads should be covered and what that means for battery size and distribution.
What happens at the site visit
We come at an agreed time, and it usually takes about an hour. On the roof we measure the usable area and check shade and roof covering. In the cellar we look at the meter cabinet and the boiler room: is there enough space for the inverter and battery? Does the fusing fit? We also ask about your consumption, your plans for a car and heating, and what matters to you.
You do not have to commit to anything. Afterwards you get the quote and decide in your own time. If you have questions, call us.
How the project runs
- Enquiry: online in a minute or by phone.
- Site visit: we check the roof, meter cabinet, boiler room and consumption. Free and with no obligation.
- Quote in 72 hours: binding, with yield, subsidies and payback.
- Notification and grid operator: we submit everything for you.
- Installation: our own installers, with a fixed date. Depending on the size of the system, installing the solar system usually takes about a week.
- Commissioning: we show you the system and the app where you see yield and consumption.
Do you already have a system? Then we check whether an extension of the solar system or a retrofitted battery is worthwhile. That also starts with a site visit.
The next step
Enter your postcode in the appointment form. We will get in touch and arrange the free site visit. After that you know what is possible in your home, what it costs and what it brings you. You only have to decide once you have the quote.
For homeowners
Our services for you
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Should I install the solar system or the heat pump first?
Either order works if the planning is right. If your heating is due for replacement, it pays to calculate the heat pump and the solar system together. At the site visit we show you what makes sense first in your home.
Is a battery worthwhile in a single-family home?
It depends on how much electricity you use during the day and what your grid operator pays for feed-in. We calculate the system with and without a battery. You see the difference in the quote in black and white.
Can I add an electric car later without rebuilding everything?
Yes. We plan the supply cable, fusing and controls so that an EV charger can be added later without major work. The same goes for a battery and a heat pump.
How secure is my power during a grid outage?
With a battery that supports backup power, important loads stay on, such as the fridge, lights and heating controls. We agree with you in advance which devices are connected.
What do I need to prepare for the site visit?
Not much. Your last electricity bill and, if you have them, plans of the house are helpful. We look at the roof, meter cabinet and boiler room and discuss your wishes.
Who takes care of notification, subsidies and the grid operator?
We do. You do not have to fill in any forms. The notification to the commune (municipality), the registration with the grid operator and the subsidy application all go through us.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





