Skip to content

Heat pumps from Zumikon and Lachen for German-speaking Switzerland

Heat pump with solar systemHeat with your own power.

We check your heating, your house and your roof on site. Within 72 hours you receive a binding quote, and we handle the subsidy application for you.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Subsidies pre-financed on request

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Heat pump

Replacing your heating with a heat pump and solar system

A heat pump takes heat from its surroundings and turns it into space heating and hot water. It needs electricity to do this. If that electricity comes from your own roof, your heating costs fall noticeably.

We replace your oil, gas or electric heating and, if needed, plan a matching solar system at the same time. From the first site visit to commissioning, everything stays with one provider.

Are you only looking for a heat pump for an apartment building or a property management company? You are in the right place too. The process is the same, only the planning is larger.

Replacing your heating: why plan now?

An oil or gas heating system lasts 20 to 25 years. If it fails in winter, often the only option is a quick replacement with the same technology. If you plan earlier, you can choose in peace, compare quotes and secure the subsidy.

It is worth enquiring even while your heating still works. During the site visit, we tell you how much remaining life is realistic and which option suits your house.

What comes on top when replacing an oil heating or gas heating system:

  • Oil tank: taken out of service, emptied and cleaned. The space that becomes free can often be used.
  • Chimney: It is no longer needed. We clarify what happens to it.
  • Gas connection: It is shut down with the supplier.
  • Hot water: The existing boiler is usually replaced by a heat pump cylinder.

Which heat pump suits your house?

There are three common systems. Which one is suitable depends on the plot, permits, heating system and budget.

System Heat source Special feature
Air-to-water Outside air Lower investment, no drilling. Noise needs attention.
Ground-source (brine-to-water) Ground Higher investment, very steady output. Permit required.
Water-to-water Groundwater Very efficient, but only possible with a water right and a suitable location.

The air-to-water heat pump is the most common in Switzerland. It can also be installed well in existing buildings. For siting, noise and costs, read air-to-water heat pump.

The ground-source heat pump uses the constant temperature underground. It works more efficiently in winter, but needs a borehole and a permit. You will find details under ground-source heat pump.

We do not decide which system makes sense for you at a desk. We look at your house and plot and calculate both options.

Heat pump with solar system: how they work together

A heat pump uses several thousand kilowatt-hours of electricity a year, most of it in winter. A solar system produces a lot in summer and less in winter. The combination still works well:

  • In spring and autumn, the heat pump runs on solar power during the day.
  • Hot water production can be moved to the hours when the sun is strong.
  • Part of the solar power that would otherwise flow into the grid becomes heating energy. Your self-consumption rises.
  • With a battery storage system and an EV charger, you use even more of your own power.

The right size is important. A system designed only for household electricity is usually not enough for a heat pump. We therefore plan the solar system with the future heating electricity in mind. The control system tunes the heat pump and the solar system to each other.

In winter, part of the electricity still comes from the grid. That is normal and applies to every heat pump. The solar system reduces that share, but does not replace it completely.

Does a heat pump work in an older building?

Yes, in the great majority of cases. The question is not the age of the house, but the flow temperature. This is the temperature at which the heating water flows into the radiators.

  • Up to about 55 degrees: A heat pump usually works well without major changes.
  • Above that: We check whether individual radiators should be replaced or the building envelope improved in places. High-temperature units are one option, but they need more electricity.
  • Underfloor heating: It is ideal, because it works with low temperatures.

During the site visit, we measure which flow temperature your radiators need at which outside temperature. This shows whether insulation is necessary. Often it is not.

Heat pump in a single-family home

In a single-family home, replacing the heating is usually straightforward. A typical choice is an air-to-water heat pump with a heating demand of about 6 to 12 kW. Depending on space, the unit stands in the garden, on the house wall or, as a split unit, partly indoors.

We pay attention to the following points at your house:

  • Where does the unit stand, and how far is it from the neighbour?
  • Is the electrical installation sufficient, or does the meter cabinet have to be adapted?
  • How large does the hot water cylinder have to be?
  • Does the roof yield match the future electricity demand?

What running costs can you expect?

The investment is only one part of the calculation. The running costs matter too, and they depend on three things: the heat demand of the house, the efficiency of the heat pump and the electricity price.

For every kilowatt-hour of electricity, a heat pump delivers several times as much heat. An oil heating system cannot do that: it burns at least one kilowatt-hour of oil for every kilowatt-hour of heat. A heat pump also needs less maintenance and no chimney sweep.

We calculate your running costs in the quote using your figures: your previous oil or gas consumption, your electricity tariff and the share of solar power. This way you see beforehand what the changeover brings in daily life, and not only after the first winter.

What happens to hot water, boiler and radiators?

A heat pump does not only heat, it also prepares the hot water. A cylinder is part of this. It is connected to the heat pump and makes sure enough hot water is always available. For hygiene reasons, it is heated to a higher temperature at regular intervals. We like to use the hours of strong sun for this.

In many cases, the existing radiators and pipes can stay. We check them during the site visit:

  • Which rooms do not get warm enough in cold weather?
  • Which radiators are too small for low flow temperatures?
  • Is the pipe network tight and insulated?
  • Are there rooms with underfloor heating that are particularly suitable?

After the check, you know whether individual radiators have to be replaced and what that costs. It is then stated in the quote.

Heat pump in an apartment building

Switching also pays off in an apartment building. The systems are larger, the planning is more complex, and several parties are involved. In condominium ownership, resolutions of the owners’ meeting are also required.

We support you from comparing options through quote and subsidies to installation. With a self-consumption community (ZEV), residents can share the solar power for the heat pump and their households. During the site visit, we show you whether this makes sense for your building.

What we check during the site visit

The site visit usually takes one to two hours. We bring measuring devices and look at what is needed for a reliable quote:

  • age, output and condition of the existing heating
  • previous consumption of oil, gas or electricity
  • radiators, underfloor heating and flow temperature
  • possible location for the heat pump and cylinder
  • electrical installation, meter cabinet and supply line
  • roof, orientation and shading for the solar system

Afterwards you know which option is possible and which is not.

What does a heat pump cost?

The costs depend on the system, the heating output and the work needed in the house. As rough guide values for a single-family home, before subsidies are deducted:

System Guide value, total cost
Air-to-water heat pump around CHF 30,000 to 50,000
Ground-source heat pump around CHF 45,000 to 70,000

These are ranges, not prices. Your price depends on the removal of tank and chimney, the condition of the radiators, the drilling depth, access to the plot and the electrical installation.

You receive the binding quote within 72 hours of the site visit, with all items, subsidies and a calculation of the running costs.

Subsidies for replacing your heating

Replacing a fossil-fuel heating system is subsidised in Switzerland. The amounts differ greatly.

  • Canton: Usually through the cantonal buildings programme. Each canton sets the amount and conditions itself.
  • Commune: Some communes and energy suppliers pay additional amounts.
  • Taxes: In most cantons, you can deduct the investment in an existing building from your taxable income.

Important: In many cantons, the subsidy application has to be submitted before construction starts. We know the deadlines and include the subsidy application for the heating replacement. And: on request, we pre-finance the subsidies, so you do not have to wait for the payout.

How your heating replacement works

  1. Enquiry: Online in a minute or by phone.
  2. Site visit: We check the heating, radiators, space, electrical installation and roof. Free of charge.
  3. Quote in 72 hours: binding, with subsidies and running costs.
  4. Permit and subsidy application: We submit the applications, the noise protection certificate and the subsidy application.
  5. Removal and installation: Old heating and tank out, new heat pump in. With ground-source systems, the drilling comes first.
  6. Solar system: If planned, we build it in the same project.
  7. Commissioning: We set the heating curve and show you how to operate it.

Planning through to commissioning stays with us. You have one contact person instead of several tradespeople.

Heat pumps in your region

Our locations are in Zumikon ZH and Lachen SZ. We work throughout German-speaking Switzerland, most often in the Cantons of Zurich, St. Gallen, Schwyz and Aargau. The rules on subsidies, noise protection and boreholes are set by the cantons and sometimes by the communes. We know the procedures locally and tell you during the site visit what applies at your address.

Enter your postcode in the appointment card, and you will see our nearest reference installations.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

How long does replacing the heating take, from enquiry to commissioning?

The site visit usually takes place within a week, and the quote follows within 72 hours. Depending on permits and delivery times, a few weeks to a few months then pass. Installing an air-to-water heat pump often takes only a few days. With a ground-source heat pump, the drilling comes on top.

When should I replace my old heating system?

Ideally before it fails. Then there is time for planning, permits and the subsidy application. If you only enquire after a breakdown, you have to decide under time pressure. For oil and gas heating from about 20 years old, it is worth asking now.

Do I have to insulate the house first?

Not in every case. What matters is the flow temperature your heating needs. We measure it during the site visit and check whether your existing radiators are sufficient or whether some should be replaced.

How loud is a heat pump?

Ground-source heat pumps and indoor units are barely audible in daily life. For outdoor air-to-water units, the model, location and distance to the neighbour matter. We calculate the noise in advance and prepare the noise protection certificate.

Can I connect the heat pump to an existing solar system?

Yes. An existing system then supplies power for the heat pump. We check whether the inverter and meter are suitable and whether the system should be extended. More under [extending a solar system](/en/expand-solar-system/).

What happens to the old oil tank?

The tank has to be taken out of service, emptied and cleaned. Depending on the canton, a notification is required. We organise the disposal and the reuse of the room as part of replacing your heating.

Who handles the registrations and the subsidy application?

We do. We submit the subsidy application for the heating replacement for you, as well as the notifications to the commune and the grid operator. You sign, and we take care of the rest.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager