Skip to content

Photovoltaics in the Canton of Aargau

Solar installation in the Canton of AargauNotify, don't apply.

In Aargau you notify the commune council of most roof systems through the EVEN platform. We handle the notification, visit you free of charge and send the quote within 72 hours.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in the Canton of Aargau: 27.7 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of Aargau

Solar power in the Canton of Aargau in figures

Household electricity price 2026
27.7ct./kWh
Median of the grid operators, excluding VAT. same as the Swiss median (27.7 ct.).
Solar potential of the roofs per year
5,421GWh
Used so far: 13.1% (Switzerland 12.8%).
Solar power per person per year
896kWh
Switzerland: 866 kWh.
of residential buildings heat with oil or gas
51.1%
Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
of passenger cars are electric
5.5%
Switzerland: 5.5%. An EV charger turns solar power into driving power.
hailstones are to be expected about every 50 years
3.5cm
Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.

Example: 10 kWp system on a single-family home in the Canton of Aargau

  • Yield per yeararound 10,000 kWh
  • Self-consumed (30%)3,000 kWh
  • Grid power saved per yeararound CHF 830
  • Federal one-off paymentCHF 3,600

Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 27.7 ct./kWh excluding VAT, plus the payment for the power you feed in. With a battery, heat pump or electric car you use more yourself. More in our guide How much does a solar system cost?

Calculate it for my roof

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

Solar installation in the Canton of Aargau

What applies to your solar system in the Canton of Aargau

Permit: notification via EVEN

In the Canton of Aargau, sufficiently well-integrated solar systems on roofs in building and agricultural zones do not need a building permit (Art. 18a RPG, § 49a Bauverordnung). You notify the commune council of the system through the cantonal platform EVEN. The criteria in the canton’s solar brochure are: a compact module area, a small distance to the roof surface, not visible above the roof edge, and low reflection. We keep to these rules when planning.

After the notification, a 30-day period starts. If the commune does not order otherwise, we can then start installation. Facade systems can also be built under the notification procedure (Meldeverfahren) if they meet the criteria. A regular building application is needed for systems on heritage-protected buildings, in protection zones and for free-standing systems. For buildings in ISOS-A townscapes, the canton applies particularly strict checks.

Subsidies in the Canton of Aargau

The federal government pays the one-off payment (Einmalvergütung, EIV) through Pronovo. Since 1 April 2025 the base amount no longer applies. Add-on systems under 30 kWp receive CHF 360 per kWp, integrated systems CHF 400 per kWp.

The canton’s 2026 subsidy programme does not support the photovoltaic system directly. It does include a bonus if you insulate the roof or facade at the same time on a building whose building permit dates from before 2000. Per square metre you get an extra CHF 30 for an add-on system on a pitched roof, CHF 100 for in-roof or facade systems and CHF 20 for green flat roofs. The photovoltaic system must cover at least 70% of the roof or facade area, and at least 50% on flat roofs. You must submit the application before building work starts. If you are planning a roof renovation, we are happy to work through the numbers with you.

For tax purposes, the Aargau tax office accepts energy-saving measures as a deduction if they were carried out at least five years after the building was completed.

Grid operator and power price

Aargau has many grid operators. The one serving the most communes is AEW Energie AG (70 communes, 27.9 ct./kWh), followed by Eniwa (15 communes, 27.2 ct.), IBB Strom (26.8 ct.), EWS Energie and Energie Oberes Fricktal. The cantonal median is 27.7 ct./kWh excluding VAT (household category H4, ElCom 2026), which is exactly the Swiss median.

The grid operator pays for the electricity you feed in, and the rate differs from one utility to the next. In the quote we calculate with the tariff of your utility.

Single-family homes in Aargau

Aargau has around 109,000 single-family homes, and about 52% of residential buildings date from before 1980. Many of these roofs are due for renovation. We plan the roof, the solar system and, if needed, a battery storage system as one package, with our own installers.

Grid operators

Electricity prices 2026 in the Canton of Aargau

What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), centimes per kWh excluding VAT
CommuneGrid operatorct./kWh
BadenRegionalwerke AG Baden27.3
AarauEniwa AG27.2
WettingenEnergie Wettingen AG26.5
WohlenIB Wohlen AG28.7
OftringenEW Oftringen AG26.1
RheinfeldenAEW Energie AG27.9
BruggIBB Strom AG26.8
ZofingenStWZ Energie AG31.5
SpreitenbachGemeinde Spreitenbach, Elektrizitätsversorgung24.3
SuhrTBS Strom AG28.8
MöhlinAEW Energie AG27.9
LenzburgSWL Energie AG26.6
RothristEW Rothrist AG27.5
ReinachEWS Energie AG27.7
NeuenhofElektrizität Wasser Neuenhof ewn26.2

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

Do I need a building application for a solar system in the Canton of Aargau?

For most roof-mounted systems in Aargau, a notification to the commune council is enough. A building application is needed for protected buildings, in protection zones and for free-standing systems. We check your address and file the notification.

Does the Canton of Aargau pay subsidies for photovoltaics?

The Canton of Aargau does not subsidise the photovoltaic system itself. The 2026 subsidy programme includes a photovoltaic bonus if you insulate the roof or facade at the same time. You apply for the bonus before building work starts.

Can I deduct a solar system from my taxes in the Canton of Aargau?

According to the tax office's information sheet, energy-saving measures are deductible if they are carried out at least five years after the building was completed. For a new build, you should clarify this with the tax office beforehand.

How much does electricity cost in the Canton of Aargau?

The cantonal median is 27.7 ct./kWh excluding VAT, which equals the Swiss median. Depending on your grid operator, the price in your commune is higher or lower.

How large does my roof need to be for a solar system?

A system is worthwhile from about 20 m². A single-family home usually has room for 8 to 15 kWp, which is about 40 to 75 m² of module area. We measure how much fits on your roof during the site visit.

How long does it take from enquiry to finished system?

The site visit usually takes place within a week, and the quote follows within 72 hours. The installation itself depends on the size of the system; for a single-family home it usually takes about a week. In between come the notification, the grid operator and the delivery of materials.

How long until a solar system has paid for itself?

That depends on the electricity price, self-consumption and the feed-in tariff of your grid operator. In the quote, we calculate the payback with your figures, not with average values.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager