Skip to content

Self-consumption community in German-speaking Fribourg

ZEV and vZEV in German-speaking FribourgOwn power in new builds.

In the Canton of Fribourg, new residential buildings must generate power on site. A ZEV distributes this solar power to all flats.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in German-speaking Fribourg: 27.3 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in German-speaking Fribourg

Apartment buildings and solar power in German-speaking Fribourg

Household electricity price 2026
27.3ct./kWh
Median of the communes, excluding VAT. 0.4 ct. below the Swiss median (27.7 ct.).
apartment buildings
1,576
13.1% of residential buildings (Switzerland 22.7%).
Solar potential of the roofs per year
505GWh
Used so far: 11.7% (Switzerland 12.8%).
Solar power per person per year
1,236kWh
Switzerland: 866 kWh.
of passenger cars are electric
4.7%
Switzerland: 5.5%. An EV charger turns solar power into driving power.
of residential buildings already use a heat pump
51.7%
Switzerland: 26.2%.

Example: apartment building with a 30 kWp system in German-speaking Fribourg

  • Yield per yeararound 30,000 kWh
  • Used in the building (50%)15,000 kWh
  • Value at the grid pricearound CHF 4,100 a year
  • Federal one-off paymentCHF 10,800

Guide value, not a quote. Assumptions: 1,000 kWh per kWp, several flats with heat pump or electric car, electricity price 27.3 ct./kWh excluding VAT. How the value is shared between owners and residents depends on the internal electricity price, which we set with you. More in our guide Solar power from your own roof

Calculate it for our building

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

ZEV and vZEV in German-speaking Fribourg

What applies in German-speaking Fribourg for your ZEV

ZEV, vZEV and LEG in brief

The federal government regulates the self-consumption community (ZEV) in the Energy Act (Art. 17 and 18) and in the Energy Ordinance (Art. 14 to 18). A ZEV brings several parties on one plot together behind a shared grid connection. The virtual ZEV (vZEV) uses existing connections and allocates the solar power through virtual metering. The local electricity community (LEG) has applied since 1 January 2026 and allows exchange over the public grid, with a reduced grid usage tariff. Which form suits your building depends on the connection and the grid operator.

What applies in German-speaking Fribourg

German-speaking Fribourg belongs to the Canton of Fribourg, so the law of the whole canton applies. Since 1 January 2020, the canton has been implementing the model energy provisions of the cantons (MuKEn 2014). For new residential buildings, a power generation system that covers about 20% of the electricity demand must therefore be installed on site. The canton specifies 10 watts per square metre of energy reference area, which corresponds to about 2 kW of installed capacity for a single-family home.

In an apartment building, the mandatory system is a reason to use the power across the whole building. The canton itself points out that the power is mostly self-consumed and is therefore cheaper than grid power. The ZEV brings this advantage to all tenants.

Grid operator and metering

In the 15 communes of German-speaking Fribourg, Groupe E is the grid operator. A ZEV needs one shared connection point and its own metering behind it. For the vZEV and the LEG, the utility provides the metering data and the allocation. We agree the metering concept and registration with Groupe E before construction, so that meters and billing are right from the start.

Our services include planning the system and the metering, registration, subsidy applications and installation with our own installers. The solar system itself is described on the solar system page.

Grid operators

Electricity prices 2026 in German-speaking Fribourg

What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), median of the communes supplied, centimes per kWh excluding VAT
Grid operatorCommunesct./kWh
Groupe E SA1527.3

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

Must a new building in German-speaking Fribourg generate solar power?

Yes. For new residential buildings, the Canton of Fribourg requires a system that covers about 20% of the electricity demand on site, at 10 watts per square metre of energy reference area. In practice, a photovoltaic system meets this.

Which utility is responsible for a ZEV in German-speaking Fribourg?

In the 15 communes of German-speaking Fribourg, Groupe E is the grid operator. We clarify registration, meters and metering data for ZEV, vZEV or LEG with the utility for you.

Is the mandatory system enough for a ZEV in an apartment building in German-speaking Fribourg?

The mandatory system is a minimum. For a ZEV, a larger system that uses as much roof area as possible is usually worthwhile. We calculate both sizes with your figures.

Do all tenants have to take part in a ZEV?

No. Anyone who does not want to take part stays with the electricity utility. Participation must be voluntary, and the solar power must not cost more than grid electricity. We set out how this is handled in your building in the concept.

What can the solar power cost in a ZEV?

The internal tariff must be below the grid operator's price for comparable customers. As an industry guide value, a discount of about 20 per cent applies. The rules can change. We check the current status during planning.

Do I need a new solar system for a ZEV?

Usually yes, or at least an extension. Existing systems can often be integrated if the metering and distribution are adapted. We check this during the site visit.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager