Self-consumption community in the Canton of Appenzell Ausserrhoden
ZEV and vZEV in the Canton of Appenzell AusserrhodenShare solar power at home.
In Ausserrhoden, SAK is the main grid operator and sets clear rules for registration and metering. We plan the system and meters to match, and the quote follows within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Appenzell Ausserrhoden: 28.7 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Appenzell Ausserrhoden
Apartment buildings and solar power in the Canton of Appenzell Ausserrhoden
- Household electricity price 2026
- 28.7ct./kWh
- Median of the grid operators, excluding VAT. 1.0 ct. above the Swiss median (27.7 ct.).
- apartment buildings
- 2,386
- 14.5% of residential buildings (Switzerland 22.7%).
- Solar potential of the roofs per year
- 428GWh
- Used so far: 18.7% (Switzerland 12.8%).
- Solar power per person per year
- 1,310kWh
- Switzerland: 866 kWh.
- of passenger cars are electric
- 4.9%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- of residential buildings already use a heat pump
- 20.9%
- Switzerland: 26.2%.
Example: apartment building with a 30 kWp system in the Canton of Appenzell Ausserrhoden
- Yield per yeararound 30,000 kWh
- Used in the building (50%)15,000 kWh
- Value at the grid pricearound CHF 4,310 a year
- Federal one-off paymentCHF 10,800
Guide value, not a quote. Assumptions: 1,000 kWh per kWp, several flats with heat pump or electric car, electricity price 28.7 ct./kWh excluding VAT. How the value is shared between owners and residents depends on the internal electricity price, which we set with you. More in our guide Solar power from your own roof
Calculate it for our buildingSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
ZEV and vZEV in the Canton of Appenzell Ausserrhoden
What applies in Appenzell Ausserrhoden for ZEV, vZEV and LEG
ZEV, vZEV and LEG in brief
In a ZEV (self-consumption community), several parties behind one shared grid connection share the solar power from their own roof. In a vZEV (virtual ZEV), every flat keeps its own connection, and the grid operator allocates the power through its metering. The LEG (local electricity community) has been possible since 1 January 2026 and allows solar power to be exchanged within a grid area. The basis is the federal Energy Act (Art. 17 and 18). Tenants take part voluntarily.
What applies in Appenzell Ausserrhoden
We have not found any cantonal rule on ZEV or vZEV. The canton checks the energy rules for new buildings through the energy certificate in the building application, based on the cantonal energy act. Whether a minimum share of your own power generation is required is something we clarify with the commune for your project, and we do not give a blanket assurance. In new apartment buildings, a ZEV combines well with the solar system.
Grid operator and metering
In the canton, St. Gallisch-Appenzellische Kraftwerke (SAK) supply most communes. They describe their rules on the web page «Strom selber produzieren und verbrauchen» (producing and using your own electricity). For such communities, these points apply there:
- Registration is made at least three months before the start, through an online form.
- For a vZEV, SAK installs the participants’ meters.
- A classic ZEV can work with its own meters behind a shared connection.
- You work out the internal cost split yourself from the quarter-hourly values. SAK does not help with this.
- The LEG requires a smart meter.
There are also small utilities in Ausserrhoden, for example in Heiden, Walzenhausen and Schönengrund. For these we ask for the rules individually. We plan the solar system and metering from a single source and coordinate everything with your utility.
Grid operators
Electricity prices 2026 in the Canton of Appenzell Ausserrhoden
What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.
| Grid operator | Communes | ct./kWh |
|---|---|---|
| St. Gallisch-Appenzellische Kraftwerke AG | 14 | 28.7 |
| Elektra Korporation EKW | 1 | 29.0 |
| Elektra Walzenhausen | 1 | 30.5 |
| Elektrizitätswerk Heiden AG | 1 | 32.8 |
| Elektrokorporation Wald - St. Peterzell | 1 | 26.0 |
| Hydrantenkorporation & Elektraversorgung Schönengrund | 1 | 29.5 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How early must I register a ZEV with SAK in Appenzell Ausserrhoden?
SAK requires registration three months in advance through an online form. We build this lead time into the schedule and prepare the details for you.
Who meters the power in a vZEV in Appenzell Ausserrhoden?
For a virtual ZEV, SAK installs the participants' meters. You work out the internal cost split yourself from the quarter-hourly values, or through a service provider. We show you both routes.
Does the LEG in Appenzell Ausserrhoden need a smart meter?
Yes, SAK names a smart meter as a requirement. Participants must also be in the same grid area and on the same grid level. We check this at the site visit.
Do all tenants have to take part in a ZEV?
No. Anyone who does not want to take part stays with the electricity utility. Participation must be voluntary, and the solar power must not cost more than grid electricity. We set out how this is handled in your building in the concept.
What can the solar power cost in a ZEV?
The internal tariff must be below the grid operator's price for comparable customers. As an industry guide value, a discount of about 20 per cent applies. The rules can change. We check the current status during planning.
Do I need a new solar system for a ZEV?
Usually yes, or at least an extension. Existing systems can often be integrated if the metering and distribution are adapted. We check this during the site visit.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





