Photovoltaics in Adligenswil
Solar installation in AdligenswilYour own power instead of 25.4 ct.
Electricity in Adligenswil costs 25.4 ct./kWh excluding VAT in 2026. We visit you for free, plan your system and deliver the quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the CKW AG tariff: 25.4 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in Adligenswil
Solar power in Adligenswil in figures
- Household electricity price 2026
- 25.4ct./kWh
- Tariff of CKW AG, excluding VAT. 2.3 ct. below the Swiss median (27.7 ct.).
- Solar potential of the roofs per year
- 31GWh
- Used so far: 15.2% (Switzerland 12.8%).
- Solar power per person per year
- 827kWh
- Switzerland: 866 kWh.
- of residential buildings heat with oil or gas
- 30.8%
- Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
- of passenger cars are electric
- 7.1%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- hailstones are to be expected about every 50 years
- 3.5cm
- Value according to MeteoSwiss. Important for choosing modules and for insurance.
Example: 10 kWp system on a single-family home in Adligenswil
- Yield per yeararound 10,000 kWh
- Self-consumed (30%)3,000 kWh
- Grid power saved per yeararound CHF 760
- Federal one-off paymentCHF 3,600
Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 25.4 ct./kWh excluding VAT, plus the payment for the power you feed in. With a battery, heat pump or electric car you use more yourself. More in our guide How much does a solar system cost?
Calculate it for my roofSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Solar installation in Adligenswil
Solar power in Adligenswil: what you should know
Electricity price and grid operator
Adligenswil is supplied by CKW AG. A household using 4,500 kWh a year pays 25.4 ct./kWh excluding VAT in 2026, 27.5 ct. including VAT. That is 2.3 ct. below the Swiss median, exactly the median in the Canton of Lucerne.
The electricity price here is not above the Swiss average. A system still pays off if it matches your consumption. That is why we plan it around your consumption, not around the largest possible area.
Roofs in Adligenswil
According to the Swiss Federal Office of Energy, the roofs in Adligenswil could deliver around 31 GWh of solar power a year, 5,450 kWh per person. Today 15.2% of it is used, compared with a Swiss average of 12.8%. That puts Adligenswil above the Swiss average.
Of the 1,201 residential buildings, 826 are single-family homes and 202 are apartment buildings.
According to MeteoSwiss, hailstones of 3.5 cm are to be expected in Adligenswil about every 50 years. This determines the hail resistance class of the modules.
Subsidies and permit
The federal government pays a one-off payment (Einmalvergütung) of CHF 360 per kW through Pronovo, so CHF 3,600 for a 10 kWp system.
What applies in the Canton of Lucerne for notification, subsidies and tax deduction is on the page Solar installation in the Canton of Lucerne. We register the system and submit the subsidy applications. On request, we pre-finance the subsidies.
30.8% of residential buildings in Adligenswil still heat with oil or gas. Anyone who later switches to a heat pump needs more power and uses more from their own roof.
We come to Adligenswil
Adligenswil is around 35 km from our location in Zumikon. Everything from planning to commissioning comes from one company, installed by our own installers.
Our nearest reference system is in Meggen: existing single-family home, 16.6 kWp (on-roof, flat roof, battery storage, backup power), built in 2025.
Postcodes of Adligenswil: 6030, 6043.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
What does electricity cost in Adligenswil?
With CKW AG, a household using 4,500 kWh a year pays 25.4 ct./kWh excluding VAT in 2026, 27.5 ct. including VAT (ElCom).
Is a solar system worth it in Adligenswil?
That depends on the roof and on your consumption. As a guide, a 10 kWp system produces around 10,000 kWh a year. If you use 30% of it yourself, you save around CHF 760 of grid power a year at the CKW AG tariff. On top come the payment for the power you feed in and a one-off payment of CHF 3,600. At the site visit we calculate with your figures.
Do you come to Adligenswil for a site visit?
Yes. Adligenswil is around 35 km from our location in Zumikon. The site visit is free and with no obligation, and you receive the quote within 72 hours.
Do I need a building permit for a solar system in the Canton of Lucerne?
On roofs in building and agricultural zones, well-integrated systems with an area of more than 20 m² need only a notification to the commune, at least 20 days before construction. A building permit is needed for cultural and natural monuments of cantonal or national importance. We clarify the case for your address and file the documents.
Is there a cantonal subsidy for photovoltaics in the Canton of Lucerne?
The Canton of Lucerne does not directly subsidise photovoltaics. The federal one-off payment through Pronovo applies. We file the application for you. On request, we pre-finance the subsidy.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Nearby
Around Adligenswil
More in Adligenswil and in the Canton of Lucerne
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request

