Solar roof in the Canton of Uri
In-roof solar in the Canton of UriCHF 400 per m² integrated
The Canton of Uri pays CHF 400 per square metre for integrated photovoltaics at a steep tilt angle when insulation is done. Free site visit, quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Uri: 25.1 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Uri
Solar power in the Canton of Uri in figures
- Household electricity price 2026
- 25.1ct./kWh
- Median of the grid operators, excluding VAT. 2.6 ct. below the Swiss median (27.7 ct.).
- Solar potential of the roofs per year
- 289GWh
- Used so far: 10.2% (Switzerland 12.8%).
- Solar potential of the façades per year
- 105GWh
- Façades yield less than roofs, but more in winter.
- Solar power per person per year
- 670kWh
- Switzerland: 866 kWh.
- of residential buildings were built before 1981
- 60.3%
- Switzerland: 59.5%. If the roof needs renovating, the solar roof can be planned in at the same time.
- hailstones are to be expected about every 50 years
- 3.5cm
- Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.
Example: 10 kWp in-roof system on a single-family home in the Canton of Uri
- Yield per yeararound 10,000 kWh
- Self-consumed (30%)3,000 kWh
- Grid power saved per yeararound CHF 750
- One-off payment for integrated systemsCHF 4,000
Guide value, not a quote. Assumptions: 1,000 kWh per kWp, electricity price 25.1 ct./kWh excluding VAT. Integrated systems receive a higher one-off payment than mounted ones, because the modules form the roof skin. More in our guide How much does a solar system cost?
Calculate it for my roofSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
In-roof solar in the Canton of Uri
What applies to your solar roof in the Canton of Uri
Solar roofs in historic core zones and protected townscapes
In the Canton of Uri, you notify sufficiently well-adapted solar systems on roofs and facades with the online form «Meldung einer Solaranlage» (notification of a solar system) to your commune’s building authority. Based on your answers, the form clarifies whether a building application is needed after all. Systems that are not sufficiently well adapted, and systems on cultural and natural monuments of cantonal or national importance, need a building permit. In townscape protection areas your commune’s rules apply, which we check in advance. For systems outside the building zone, further rules apply, which we clarify with the canton in advance. We did not find a separate cantonal in-roof rule in the documents.
Subsidies
For integrated systems, the federal government pays a higher one-off payment (Einmalvergütung, EIV) through Pronovo than for add-on systems. Uri also goes its own way. The Energie Uri 2026 subsidy programme pays CHF 60 per square metre for thermal insulation of the building envelope. For areas with integrated photovoltaics at a tilt of 60 to 90 degrees, it is CHF 400 per square metre. The canton defines integrated as the modules replacing the weather-protection layer. This applies to in-roof and facade systems. The requirements are a building permit for the building from before 2000, an application before construction starts, the U-value requirements and a plan showing the module area. Complete replacement of the roof in the same place is also eligible. Completely new building parts, extensions and additional storeys are not, as the subsidy targets existing buildings.
Plan the roof renovation and solar roof together
A tilt of 60 to 90 degrees mainly suits facades and very steep roofs. It also brings more winter electricity, which counts in the Uri valleys with the shadows of the mountain slopes. On flatter roofs, an in-roof system remains a question of appearance, roof build-up and cost. At the site visit we work out both routes and submit the application before construction starts.
Grid operators
Electricity prices 2026 in the Canton of Uri
What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Altdorf | energieUri AG | 25.1 |
| Schattdorf | energieUri AG | 25.1 |
| Erstfeld | Gemeindewerke Erstfeld | 29.4 |
| Bürglen | energieUri AG | 25.1 |
| Flüelen | energieUri AG | 25.1 |
| Seedorf | energieUri AG | 25.1 |
| Silenen | energieUri AG | 25.1 |
| Attinghausen | energieUri AG | 25.1 |
| Andermatt | Elektrizitätswerk Ursern | 24.7 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
What counts as an integrated photovoltaic system in the Canton of Uri?
A system counts as integrated if the modules replace the external weather-protection layer and are part of the facade or roof system. It cannot be removed without impairing the function of the building envelope. An add-on system does not meet this.
How high is the subsidy for integrated solar modules in the Canton of Uri?
The Energie Uri 2026 subsidy programme pays CHF 400 per square metre of renovated area with integrated photovoltaics at a tilt of 60 to 90 degrees. The condition is thermal insulation of the same building element on a building with a building permit from before 2000.
Can I combine the integration bonus with the winter electricity contribution in the Canton of Uri?
No. The higher contribution for integrated systems cannot be combined with measure UR-06, photovoltaics for winter electricity. We work out both routes and choose the more favourable one.
Is an in-roof system watertight?
Yes, if it is properly planned and installed. Together with flashings and seals, the modules form the water-bearing layer. Underneath, an underlay membrane remains as a second safeguard. Connections at the chimney, ridge and eaves are the critical points. We work with particular care there.
Can I convert my existing roof to in-roof?
Yes, but it only makes sense as part of a roof renovation. The tiles have to come off anyway then. If your roof is still in good condition, an on-roof system is usually the more economical solution. We tell you honestly during the site visit what is worthwhile.
Will an in-roof system be approved in a historic core zone?
Often more readily than an on-roof system, because it looks calmer. For protected buildings and in historic core zones, a permit is required, and the commune decides case by case. We clarify the situation for your address and submit the documents.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





