Heat pump in the Canton of Uri
Heat pump in the Canton of UriHeating system, Uri.
A revised Energy Act applies in the Canton of Uri from autumn 2026, and the Energie Uri 2026 subsidy programme is running. We check your house on site free of charge, and the quote follows within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Uri: 25.1 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Uri
Heating in the Canton of Uri in figures
- Household electricity price 2026
- 25.1ct./kWh
- Median of the grid operators, excluding VAT. 2.6 ct. below the Swiss median (27.7 ct.).
- of residential buildings heat with oil or gas
- 30.7%
- Switzerland: 49.8%. Oil 30.7%, gas 0.1%.
- of residential buildings already use a heat pump
- 26.5%
- Switzerland: 26.2%.
- of residential buildings were built before 1981
- 60.3%
- Switzerland: 59.5%. Older houses often still run oil or gas boilers.
- Solar power per person per year
- 670kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 289GWh
- Used so far: 10.2% (Switzerland 12.8%).
Example: replacing an oil heating system in a single-family home in the Canton of Uri
- Heat demand per yeararound 20,000 kWh
- Heating oil no longer neededaround 2,000 litres
- Power needed by the heat pumparound 5,700 kWh
- Cost with grid poweraround CHF 1,430
Guide value, not a quote. Assumptions: air-to-water heat pump with a seasonal performance factor of 3.5, around 10 kWh of heat per litre of heating oil, electricity price 25.1 ct./kWh excluding VAT. Power from your own roof lowers the cost, and a ground-source heat pump needs less power. More in our guide How much does a heat pump cost?
Calculate it for my houseSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Heat pump in the Canton of Uri
What applies to your heat pump in the Canton of Uri
Permit: commune for air-to-water, canton for boreholes
In the Canton of Uri, air-to-water heat pumps are approved by the building authority of your commune, and no cantonal permit is provided for them. A noise protection assessment is usually needed. We prepare it with the application and submit permit and subsidy applications.
For boreholes (ground probes), the Directorate of Construction approves the drilling. A concession is then needed for the use. The application is made as a building application through the online portal. The Uri geoportal shows the permissibility map for borehole drilling. We check it before the quote.
Replacing your heating system: what the Energy Act requires
On 8 March 2026, Uri voters adopted the partial revision of the Energy Act. The new provisions apply from autumn 2026 and are based on the cantons’ model provisions of 2014. Anyone replacing an oil or electric heating system should therefore seek advice before deciding. We clarify with the energy office during the site visit which requirements apply in your case.
Subsidies in the Canton of Uri
The Energie Uri 2026 subsidy programme makes about CHF 2.1 million available. For replacing a heating system, these rates apply up to 70 kW:
- Air-to-water: CHF 3,000, plus CHF 60 per kW from 20 kW
- Boreholes: CHF 8,000, plus CHF 180 per kW from 30 kW
Up to 15 kW, the heat pump system module (Wärmepumpen-System-Modul) is mandatory. The application must be submitted in full before installation starts. For boreholes, the start of drilling counts as the start, if it comes before installation. You can find more about the options under heat pump.
Grid operator and electricity price
Most communes are supplied by energieUri (14 communes), alongside the Elektrizitätswerk Ursern, the Elektrizitätswerk Göschenen and the Gemeindewerke Erstfeld. The cantonal median is 25.1 ct./kWh excluding VAT, below the Swiss median of 27.7 ct. The utilities range between 16.4 and 29.4 ct. We register the connection with your grid operator.
A special feature: old houses and mountain locations
About 60 percent of Uri’s residential buildings date from before 1981, and around 31 percent heat with oil. In mountain locations, design for cold winter days plays a big role. During the site visit, we check whether air-to-water or a borehole is the better solution.
Grid operators
Electricity prices 2026 in the Canton of Uri
What power from the grid costs is set by your grid operator. It sets the running costs of your heat pump. Power from your own roof lowers them, and the more expensive grid power is, the more it saves.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Altdorf | energieUri AG | 25.1 |
| Schattdorf | energieUri AG | 25.1 |
| Erstfeld | Gemeindewerke Erstfeld | 29.4 |
| Bürglen | energieUri AG | 25.1 |
| Flüelen | energieUri AG | 25.1 |
| Seedorf | energieUri AG | 25.1 |
| Silenen | energieUri AG | 25.1 |
| Attinghausen | energieUri AG | 25.1 |
| Andermatt | Elektrizitätswerk Ursern | 24.7 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How high is the subsidy for a heat pump in the Canton of Uri?
Up to 70 kW, an air-to-water heat pump receives CHF 3,000, with CHF 60 per kW added from 20 kW. For boreholes it is CHF 8,000, with CHF 180 per kW added from 30 kW. The application must be submitted before installation starts, and we submit it for you.
Do I need a permit for a borehole in the Canton of Uri?
Yes, drilling is approved by the Directorate of Construction (Baudirektion). The application is made as a building application through the online portal. The Uri geoportal shows in advance whether boreholes are permitted at your site.
What changes in the Canton of Uri with the new Energy Act?
The partial revision was adopted on 8 March 2026 with 75 percent in favour and applies from autumn 2026. We clarify with the energy office during the site visit which requirements apply in your case when a heating system is replaced.
Do I have to submit a building application for an air-to-water heat pump in the Canton of Uri?
The permit goes through the commune, and the canton does not approve air heat pumps itself. A noise protection assessment is usually part of the application, and we prepare it.
How long does replacing the heating take, from enquiry to commissioning?
The site visit usually takes place within a week, and the quote follows within 72 hours. Depending on permits and delivery times, a few weeks to a few months then pass. Installing an air-to-water heat pump often takes only a few days. With a ground-source heat pump, the drilling comes on top.
When should I replace my old heating system?
Ideally before it fails. Then there is time for planning, permits and the subsidy application. If you only enquire after a breakdown, you have to decide under time pressure. For oil and gas heating from about 20 years old, it is worth asking now.
Do I have to insulate the house first?
Not in every case. What matters is the flow temperature your heating needs. We measure it during the site visit and check whether your existing radiators are sufficient or whether some should be replaced.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
Heat pump in your commune
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request




