Heat pump in Upper Valais
Heat pump in Upper ValaisHeating system, Valais.
The Canton of Valais pays CHF 9,000 for an air-to-water heat pump in a single-family home and CHF 13,000 for a borehole. We check your house free of charge and prepare the quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in Upper Valais: 24.6 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in Upper Valais
Heating in Upper Valais in figures
- Household electricity price 2026
- 24.6ct./kWh
- Median of the communes, excluding VAT. 3.1 ct. below the Swiss median (27.7 ct.).
- of residential buildings heat with oil or gas
- 35.8%
- Switzerland: 49.8%. Oil 34.8%, gas 0.9%.
- of residential buildings already use a heat pump
- 17.6%
- Switzerland: 26.2%.
- of residential buildings were built before 1981
- 60.3%
- Switzerland: 59.5%. Older houses often still run oil or gas boilers.
- Solar power per person per year
- 1,119kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 1,118GWh
- Used so far: 9.1% (Switzerland 12.8%).
Example: replacing an oil heating system in a single-family home in Upper Valais
- Heat demand per yeararound 20,000 kWh
- Heating oil no longer neededaround 2,000 litres
- Power needed by the heat pumparound 5,700 kWh
- Cost with grid poweraround CHF 1,400
Guide value, not a quote. Assumptions: air-to-water heat pump with a seasonal performance factor of 3.5, around 10 kWh of heat per litre of heating oil, electricity price 24.6 ct./kWh excluding VAT. Power from your own roof lowers the cost, and a ground-source heat pump needs less power. More in our guide How much does a heat pump cost?
Calculate it for my houseSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Heat pump in Upper Valais
What applies to your heat pump in Upper Valais
Permit: air-to-water and borehole
For air-to-water heat pumps inside the building zone, the communes are responsible. They check whether noise protection is met. If the heat pump replaces an existing heating system, the cantonal Building Ordinance provides for a notification procedure. If the project does not meet the criteria, an ordinary building permit is needed. We prepare the noise assessment and clarify with your commune which procedure applies.
Boreholes (ground probes) need a water protection permit from the Environment Service. Inside the building zone the application goes to the commune, outside it to the Cantonal Building Secretariat. For more than four boreholes per plot or depths over 200 metres, the canton requires a hydrogeological feasibility study.
Replacing your heating system: what the Energy Act requires
The new cantonal energy legislation has applied since 1 January 2025. When an oil or gas boiler is replaced, a heating system using renewable energy is to be installed. A fossil heating system remains possible if the heat demand falls by at least 20 percent or the building reaches GEAK class D. The Energy and Hydropower Service examines such cases in advance. Central electric heating systems must be replaced by renewable systems within 15 years of the law coming into force.
Subsidies in the Canton of Valais
The canton’s Buildings Programme subsidises replacing oil, gas and electric heating with electric heat pumps up to 70 kW. In a single-family home it is CHF 9,000 for air-to-water units and CHF 13,000 for boreholes and water-to-water units. For apartment buildings and other buildings, the canton calculates CHF 45 (air-to-water) or CHF 65 (borehole) per square metre of energy reference area, with a correction factor.
The application is submitted digitally on the Das Gebäudeprogramm platform. Work only starts after the Energy and Hydropower Service has confirmed approval by email. Up to 15 kW, the heat pump system module (Wärmepumpen-System-Modul) is required. We submit permit and subsidy applications.
Grid operator and electricity price
In Upper Valais, several utilities supply the electricity, including EnBAG Netze, RELL, VED Visp Energie Dienste and EVTL in the Lötschental. At 24.6 ct. per kWh, the median of the communes is below the Swiss median of 27.7 ct. (excluding VAT, household category H4, ElCom 2026). We register the heat pump with the grid operator. Blocking times and tariffs differ by utility, and we clarify them in advance.
A special feature
The higher a house lies, the colder it gets in winter. The heat pump must be designed for the lowest outdoor temperatures at the site, and we clarify this during the site visit. The oil share of heating systems in Upper Valais is 35 percent.
Grid operators
Electricity prices 2026 in Upper Valais
What power from the grid costs is set by your grid operator. It sets the running costs of your heat pump. Power from your own roof lowers them, and the more expensive grid power is, the more it saves.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Brig-Glis | EnBAG Netze AG | 28.5 |
| Naters | EnBAG Netze AG | 28.5 |
| Visp | VED Visp Energie Dienste AG | 24.6 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How high is the subsidy for a heat pump in Upper Valais?
In a single-family home, the Canton of Valais pays CHF 9,000 for an air-to-water heat pump and CHF 13,000 for a borehole. For apartment buildings, it is calculated by energy reference area. Approval must be in place before work starts, and we submit the application for you.
Do I have to replace my oil heating system with a renewable one in Upper Valais?
Since 1 January 2025, a renewable heating system is to be installed when an oil or gas boiler is replaced. A fossil heating system remains permitted only if the heat demand falls by at least 20 percent or the building reaches GEAK class D (cantonal energy certificate for buildings).
Do I need a building permit for an air-to-water heat pump in Upper Valais?
If the heat pump replaces an existing heating system, a notification procedure (Meldeverfahren) at the commune may be enough. Otherwise an ordinary building permit is needed. Noise protection is assessed in both cases, and we take care of the documents.
May I drill a borehole in Upper Valais?
Drilling needs a water protection permit from the Environment Service (Dienststelle für Umwelt). The application goes to the commune, or outside the building zone to the Cantonal Building Secretariat. The permissibility map shows whether conditions apply at your site.
How long does replacing the heating take, from enquiry to commissioning?
The site visit usually takes place within a week, and the quote follows within 72 hours. Depending on permits and delivery times, a few weeks to a few months then pass. Installing an air-to-water heat pump often takes only a few days. With a ground-source heat pump, the drilling comes on top.
When should I replace my old heating system?
Ideally before it fails. Then there is time for planning, permits and the subsidy application. If you only enquire after a breakdown, you have to decide under time pressure. For oil and gas heating from about 20 years old, it is worth asking now.
Do I have to insulate the house first?
Not in every case. What matters is the flow temperature your heating needs. We measure it during the site visit and check whether your existing radiators are sufficient or whether some should be replaced.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
Heat pump in your commune
Communes in Upper Valais
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request




