Skip to content

Heat pump in the Canton of St. Gallen

Heat pump in the Canton of St. GallenHeating system, St. Gallen.

In the Canton of St. Gallen, the energy agency subsidises heat pumps that replace oil, gas and electric heating. We check your house free of charge and prepare the quote within 72 hours.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in the Canton of St. Gallen: 29.8 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of St. Gallen

Heating in the Canton of St. Gallen in figures

Household electricity price 2026
29.8ct./kWh
Median of the grid operators, excluding VAT. 2.1 ct. above the Swiss median (27.7 ct.).
of residential buildings heat with oil or gas
49.5%
Switzerland: 49.8%. Oil 27.1%, gas 22.4%.
of residential buildings already use a heat pump
31.0%
Switzerland: 26.2%.
of residential buildings were built before 1981
58.7%
Switzerland: 59.5%. Older houses often still run oil or gas boilers.
Solar power per person per year
1,170kWh
Switzerland: 866 kWh.
Solar potential of the roofs per year
4,072GWh
Used so far: 17.0% (Switzerland 12.8%).

Example: replacing an oil heating system in a single-family home in the Canton of St. Gallen

  • Heat demand per yeararound 20,000 kWh
  • Heating oil no longer neededaround 2,000 litres
  • Power needed by the heat pumparound 5,700 kWh
  • Cost with grid poweraround CHF 1,700

Guide value, not a quote. Assumptions: air-to-water heat pump with a seasonal performance factor of 3.5, around 10 kWh of heat per litre of heating oil, electricity price 29.8 ct./kWh excluding VAT. Power from your own roof lowers the cost, and a ground-source heat pump needs less power. More in our guide How much does a heat pump cost?

Calculate it for my house

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

Heat pump in the Canton of St. Gallen

What applies to your heat pump in the Canton of St. Gallen

Permit: building application for air-to-water, cantonal permit for boreholes

In the Canton of St. Gallen, air-to-water heat pumps need a permit wherever they are installed, even if only a heating system is being replaced. Inside the building zone, the building application usually goes through the simplified procedure. The commune decides case by case under the Planning and Building Act (sGS 731.1). The building application form, the energy proof EN-120, dimensioned plans, the data sheet and the heat pump declaration as noise protection assessment are submitted. If there are no objections, the procedure moves quickly.

Every borehole (ground probe) needs a permit from the canton, and the Office for Water and Energy is responsible. The application goes through the commune. The map of permissible areas distinguishes yellow (permitted with a permit), brown (permitted with conditions, a preliminary hydrogeological assessment is needed) and red (generally not permitted). We check your site before the quote and handle the building application and the borehole application for you.

Replacing your heating system: what the Energy Act requires

Oil and gas heating systems remain allowed in the Canton of St. Gallen. When they are replaced, however, 10 percent of the heat demand must be saved or covered from renewable sources. There are standard solutions for this, such as a solar thermal system, new windows or insulation. Exceptions are provided for financial hardship or imminent demolition. With a heat pump, no additional measures are needed.

Subsidies in the Canton of St. Gallen

On behalf of the canton, the Energieagentur St.Gallen pays subsidies for replacing permanently installed electric heating and fossil heating with heat pumps. According to the guide, it is CHF 2,800 for air-to-water up to 20 kW of thermal output, and above that CHF 1,600 plus CHF 60 per kW. For brine-to-water and water-to-water, it is CHF 6,000 up to 20 kW, and between 20 and 70 kW CHF 2,400 plus CHF 180 per kW. The subsidy is capped at 50 percent of the investment.

The application must be submitted online to the energy agency before execution. If work starts earlier, the subsidy lapses. The commitment is valid for two years. We submit the application for you.

Grid operator and electricity price

The cantonal median is 29.8 ct./kWh excluding VAT, above the Swiss median of 27.7 ct. St. Gallisch-Appenzellische Kraftwerke AG supplies 15 communes (29.3 ct.), St.Galler Stadtwerke two communes (30.6 ct.) and Regionalwerk Toggenburg AG three communes (24.8 ct.). The heat pump is registered with the grid operator through a technical connection application. Some utilities have their own tariffs or blocking times, and we clarify this for your utility.

A special feature: valley floors and hill country

The canton includes the Rhine Valley, the Toggenburg and cities with very different conditions. 31.0 percent of residential buildings already have a heat pump, and 49.5 percent are still heated with fossil fuels. We design the heat pump for your house and check whether a solar system reduces your electricity needs.

Grid operators

Electricity prices 2026 in the Canton of St. Gallen

What power from the grid costs is set by your grid operator. It sets the running costs of your heat pump. Power from your own roof lowers them, and the more expensive grid power is, the more it saves.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), centimes per kWh excluding VAT
CommuneGrid operatorct./kWh
St. GallenSt.Galler Stadtwerke30.6
Rapperswil-JonaElektrizitätswerk Jona-Rapperswil AG23.1
WilTechnische Betriebe Wil31.1
GossauStadtwerke Gossau27.9
UzwilSt. Gallisch-Appenzellische Kraftwerke AG29.7
BuchsElektrizitäts- und Wasserwerk der Stadt Buchs (EWB)29.6
AltstättenTechnische Betriebe Altstätten31.2
FlawilTechnische Betriebe Flawil (TBF)27.9
WidnauPolitische Gemeinde Widnau, Elektra / Stromversorgung27.1
RorschachTechnische Betriebe, Stadt Rorschach26.4
EschenbachSt. Gallisch-Appenzellische Kraftwerke AG29.3
WittenbachSt.Galler Stadtwerke29.5
Kirchbergrwt Regionalwerk Toggenburg AG25.1
GoldachTechnische Betriebe Goldach30.5
MelsPolitische Gemeinde Mels, Elektrizitäts- & Wasserwerk26.9

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

Do I need a building permit for an air-to-water heat pump in the Canton of St. Gallen?

Yes, in the Canton of St. Gallen, air-to-water heat pumps need a permit wherever they are installed. The simplified procedure, which the commune decides on, is usually enough. We submit the building application with the noise protection assessment for you.

How high is the subsidy for a heat pump in the Canton of St. Gallen?

According to the energy agency's guide, it is CHF 2,800 for air-to-water up to 20 kW and CHF 6,000 for boreholes up to 20 kW. Above that, output-based amounts apply up to 70 kW. The application must be submitted before execution.

Do I have to replace an oil heating system with a renewable one in the Canton of St. Gallen?

No, there is no obligation to install a heat pump. But anyone who stays with fossil fuel must save 10 percent of the energy demand or cover it from renewable sources, for example with a standard solution. A heat pump meets this without additional measures.

What permit does a borehole need in the Canton of St. Gallen?

Every borehole needs a permit from the canton, and the Office for Water and Energy (Amt für Wasser und Energie) is responsible. The application goes through the commune. The permissibility map shows yellow, brown and red areas.

How long does replacing the heating take, from enquiry to commissioning?

The site visit usually takes place within a week, and the quote follows within 72 hours. Depending on permits and delivery times, a few weeks to a few months then pass. Installing an air-to-water heat pump often takes only a few days. With a ground-source heat pump, the drilling comes on top.

When should I replace my old heating system?

Ideally before it fails. Then there is time for planning, permits and the subsidy application. If you only enquire after a breakdown, you have to decide under time pressure. For oil and gas heating from about 20 years old, it is worth asking now.

Do I have to insulate the house first?

Not in every case. What matters is the flow temperature your heating needs. We measure it during the site visit and check whether your existing radiators are sufficient or whether some should be replaced.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager