Heat pump in German-speaking Fribourg
Heat pump in German-speaking FribourgHeating system, Fribourg.
The Canton of Fribourg pays CHF 3,500 plus CHF 150 per kW for air-to-water heat pumps up to 70 kW. We check your house on site free of charge and prepare the quote within 72 hours.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in German-speaking Fribourg: 27.3 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in German-speaking Fribourg
Heating in German-speaking Fribourg in figures
- Household electricity price 2026
- 27.3ct./kWh
- Median of the communes, excluding VAT. 0.4 ct. below the Swiss median (27.7 ct.).
- of residential buildings heat with oil or gas
- 25.4%
- Switzerland: 49.8%. Oil 24.4%, gas 0.9%.
- of residential buildings already use a heat pump
- 51.7%
- Switzerland: 26.2%.
- of residential buildings were built before 1981
- 48.0%
- Switzerland: 59.5%. Older houses often still run oil or gas boilers.
- Solar power per person per year
- 1,236kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 505GWh
- Used so far: 11.7% (Switzerland 12.8%).
Example: replacing an oil heating system in a single-family home in German-speaking Fribourg
- Heat demand per yeararound 20,000 kWh
- Heating oil no longer neededaround 2,000 litres
- Power needed by the heat pumparound 5,700 kWh
- Cost with grid poweraround CHF 1,560
Guide value, not a quote. Assumptions: air-to-water heat pump with a seasonal performance factor of 3.5, around 10 kWh of heat per litre of heating oil, electricity price 27.3 ct./kWh excluding VAT. Power from your own roof lowers the cost, and a ground-source heat pump needs less power. More in our guide How much does a heat pump cost?
Calculate it for my houseSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Heat pump in German-speaking Fribourg
What applies to your heat pump in German-speaking Fribourg
Permit: air-to-water and borehole
For an air-to-water heat pump with an outdoor unit, noise protection is the main concern. The Canton of Fribourg has given the communes recommendations for building applications in the simplified procedure. If the unit is quiet and stands far enough from the nearest neighbour, the state of the art and the noise limits are deemed to be met. We choose the model and location accordingly and prepare the documents for your commune.
For a borehole (ground probe), the cantonal permissibility map shows whether drilling is possible at your site from a groundwater protection point of view. In prohibition zones, no new borehole can be approved. In the building application, the Environment Office, the Energy Office and the Office for Construction and Spatial Planning give their opinions.
Replacing your heating system: what the Energy Act requires
Since 1 January 2020, a requirement has applied in the Canton of Fribourg when an oil or gas heating system is replaced: no more than 80 percent of the heat demand for heating and hot water may be covered by non-renewable energy. For new buildings, 30 percent must be renewable. A heat pump meets this requirement. The canton has also set conditions for replacing an electric heating system.
Subsidies in German-speaking Fribourg
The canton’s Buildings Programme has applied in its current version since 1 January 2025. It subsidises heat pumps that replace an oil, gas or permanently installed electric resistance heating system. Air-to-water units up to 70 kW receive CHF 3,500 plus CHF 150 per kW. For ground-source (borehole) and water-to-water units up to 70 kW, it is CHF 5,000 plus CHF 300 per kW. The subsidy is calculated with at most 50 watts of rated output per square metre of energy reference area. Up to 15 kW, the heat pump system module (Wärmepumpen-System-Modul) is required.
Work may only start once you have received approval. We submit permit and subsidy applications.
Grid operator and electricity price
In all 15 communes of German-speaking Fribourg, Groupe E supplies the electricity. At 27.3 ct. per kWh, the median is just below the Swiss median of 27.7 ct. (excluding VAT, household category H4, ElCom 2026). We register the heat pump with Groupe E. We clarify tariffs and blocking times in advance.
A special feature
In German-speaking Fribourg, more than half of residential buildings already heat with a heat pump. The oil share is 24 percent, and buildings from before 1981 make up 48 percent. In newer houses, the existing radiators are often sufficient, and we check this during the site visit.
Grid operators
Electricity prices 2026 in German-speaking Fribourg
What power from the grid costs is set by your grid operator. It sets the running costs of your heat pump. Power from your own roof lowers them, and the more expensive grid power is, the more it saves.Swiss median: 27.7 ct./kWh.
| Grid operator | Communes | ct./kWh |
|---|---|---|
| Groupe E SA | 15 | 27.3 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How high is the subsidy for a heat pump in German-speaking Fribourg?
The Canton of Fribourg pays CHF 3,500 plus CHF 150 per kW for air-to-water heat pumps up to 70 kW. For ground-source (borehole) and water-to-water units up to 70 kW it is CHF 5,000 plus CHF 300 per kW. Work may only start after approval, and we submit the application for you.
What does the Canton of Fribourg require when a heating system is replaced?
Since 1 January 2020, when an oil or gas heating system is replaced, no more than 80 percent of the heat demand may be covered by non-renewable energy. A heat pump meets this requirement.
May I drill a borehole in German-speaking Fribourg?
The cantonal map of the permissibility of ground-source heat boreholes shows this. In prohibition zones, no new borehole can be approved. In the building application, the Environment Office, the Energy Office and the Office for Construction and Spatial Planning give their opinions. We prepare the documents.
Is there additional subsidy from the commune in German-speaking Fribourg?
Some communes have their own subsidy programmes, and the canton lists them on its subsidy page. We ask your commune whether a contribution is added to the cantonal subsidy.
How long does replacing the heating take, from enquiry to commissioning?
The site visit usually takes place within a week, and the quote follows within 72 hours. Depending on permits and delivery times, a few weeks to a few months then pass. Installing an air-to-water heat pump often takes only a few days. With a ground-source heat pump, the drilling comes on top.
When should I replace my old heating system?
Ideally before it fails. Then there is time for planning, permits and the subsidy application. If you only enquire after a breakdown, you have to decide under time pressure. For oil and gas heating from about 20 years old, it is worth asking now.
Do I have to insulate the house first?
Not in every case. What matters is the flow temperature your heating needs. We measure it during the site visit and check whether your existing radiators are sufficient or whether some should be replaced.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
Heat pump in your commune
Communes in German-speaking Fribourg
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request




