Skip to content

Heat pump in the Canton of Appenzell Ausserrhoden

Heat pump in the Canton of Appenzell AusserrhodenHeating in Appenzell.

Appenzell Ausserrhoden pays a fixed flat rate for heat pumps that replace oil, gas and electric heating. We check your house free of charge and prepare the quote within 72 hours.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in the Canton of Appenzell Ausserrhoden: 28.7 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of Appenzell Ausserrhoden

Heating in the Canton of Appenzell Ausserrhoden in figures

Household electricity price 2026
28.7ct./kWh
Median of the grid operators, excluding VAT. 1.0 ct. above the Swiss median (27.7 ct.).
of residential buildings heat with oil or gas
48.2%
Switzerland: 49.8%. Oil 31.6%, gas 16.6%.
of residential buildings already use a heat pump
20.9%
Switzerland: 26.2%.
of residential buildings were built before 1981
71.6%
Switzerland: 59.5%. Older houses often still run oil or gas boilers.
Solar power per person per year
1,310kWh
Switzerland: 866 kWh.
Solar potential of the roofs per year
428GWh
Used so far: 18.7% (Switzerland 12.8%).

Example: replacing an oil heating system in a single-family home in the Canton of Appenzell Ausserrhoden

  • Heat demand per yeararound 20,000 kWh
  • Heating oil no longer neededaround 2,000 litres
  • Power needed by the heat pumparound 5,700 kWh
  • Cost with grid poweraround CHF 1,640

Guide value, not a quote. Assumptions: air-to-water heat pump with a seasonal performance factor of 3.5, around 10 kWh of heat per litre of heating oil, electricity price 28.7 ct./kWh excluding VAT. Power from your own roof lowers the cost, and a ground-source heat pump needs less power. More in our guide How much does a heat pump cost?

Calculate it for my house

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

Heat pump in the Canton of Appenzell Ausserrhoden

What applies to your heat pump in Appenzell Ausserrhoden

Permit: simplified procedure for air-to-water, application for boreholes

Since the partial revision of the Building Ordinance on 1 April 2022, the notification procedure (Meldeverfahren) generally applies to heating systems. Because of Federal Supreme Court case law, outdoor air-to-water heat pumps still go through the simplified procedure. This includes a noise protection assessment. Your commune of residence is the point of contact. We prepare the assessment, choose a quiet unit and a suitable location, and submit the application.

For boreholes (ground probes), you or we first check the borehole map in the geoportal. Yellow means permitted, brown means permitted with conditions after a geological assessment, and red means not permitted. The application is submitted to your commune of residence, and the Office for the Environment issues the specialist permit. For drilling, the canton requires a deposit of CHF 1,000, which is refunded once the final documents are complete.

Replacing your heating system: what the Energy Act requires

When a heating system is replaced in existing buildings with residential use, at least 20 percent of the heat must come from renewable sources or be compensated by efficiency measures. A heat pump meets this in full. Fossil heating systems remain possible but require additional measures.

Subsidies in Appenzell Ausserrhoden

The canton subsidises replacing oil, gas and electric heating in buildings that are at least five years old. An air-to-water heat pump receives CHF 4,850 up to 12.5 kW thermal output, and above that CHF 4,100 plus CHF 60 per kW. A brine-to-water heat pump receives CHF 10,000 up to 12.5 kW, and above that CHF 7,750 plus CHF 180 per kW. The subsidy is capped at 50 percent of the investment. The heat pump system module (Wärmepumpen-System-Modul) is required.

The application must be submitted to the Verein Energie AR/AI before work starts. The commitment of the subsidy lapses after 24 months. We submit the application and keep an eye on the deadline.

Grid operator and electricity price

The cantonal median is 28.7 ct./kWh excluding VAT, slightly above the Swiss median of 27.7 ct. St. Gallisch-Appenzellische Kraftwerke AG supplies 14 of the 20 communes (28.7 ct.). There are also small utilities such as the Elektrizitätswerk Heiden (32.8 ct.), Elektra Walzenhausen (30.5 ct.) and Elektrokorporation Wald-St. Peterzell (26.0 ct.). The heat pump is registered with the grid operator through a technical connection application. Some utilities have their own tariffs or blocking times, and we clarify this for your utility.

A special feature: very many older buildings

71.6 percent of residential buildings date from before 1981, and only 20.9 percent have a heat pump so far. In older buildings, we measure the flow temperature during the site visit and check whether the existing radiators are sufficient. A solar system on the roof lowers the electricity costs of the heat pump.

Grid operators

Electricity prices 2026 in the Canton of Appenzell Ausserrhoden

What power from the grid costs is set by your grid operator. It sets the running costs of your heat pump. Power from your own roof lowers them, and the more expensive grid power is, the more it saves.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), median of the communes supplied, centimes per kWh excluding VAT
Grid operatorCommunesct./kWh
St. Gallisch-Appenzellische Kraftwerke AG1428.7
Elektra Korporation EKW129.0
Elektra Walzenhausen130.5
Elektrizitätswerk Heiden AG132.8
Elektrokorporation Wald - St. Peterzell126.0
Hydrantenkorporation & Elektraversorgung Schönengrund129.5

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

How high is the subsidy for a heat pump in Appenzell Ausserrhoden?

An air-to-water heat pump receives CHF 4,850 up to 12.5 kW, and a ground-source (borehole) heat pump CHF 10,000. For larger output, an amount per kW is added. The subsidy is capped at 50 percent of the investment.

Where do I submit the subsidy application in Appenzell Ausserrhoden?

To the Verein Energie AR/AI (the energy association of both Appenzell cantons) through the subsidy portal, and before work starts. Applications submitted later are not considered. We submit the application for you.

How much renewable heat does Appenzell Ausserrhoden require when a heating system is replaced?

When replacing a system in existing residential buildings, at least 20 percent of the heat must come from renewable sources or be replaced by efficiency measures. A heat pump covers the demand entirely from renewable sources. No further proof is then needed.

May I drill a borehole in Appenzell Ausserrhoden?

The borehole map in the geoportal shows this, with yellow, brown and red areas. The application goes through your commune of residence, and the Office for the Environment (Amt für Umwelt) issues the specialist permit. We check the site before the quote.

How long does replacing the heating take, from enquiry to commissioning?

The site visit usually takes place within a week, and the quote follows within 72 hours. Depending on permits and delivery times, a few weeks to a few months then pass. Installing an air-to-water heat pump often takes only a few days. With a ground-source heat pump, the drilling comes on top.

When should I replace my old heating system?

Ideally before it fails. Then there is time for planning, permits and the subsidy application. If you only enquire after a breakdown, you have to decide under time pressure. For oil and gas heating from about 20 years old, it is worth asking now.

Do I have to insulate the house first?

Not in every case. What matters is the flow temperature your heating needs. We measure it during the site visit and check whether your existing radiators are sufficient or whether some should be replaced.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

Locations

Heat pump in your commune

Communes in the Canton of Appenzell Ausserrhoden

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager