Charging for apartment buildings in the Canton of Thurgau
EV charging for underground car parks in the Canton of Thurgau15 percent subsidised.
In 2026, the Canton of Thurgau subsidises the installation of charging infrastructure in apartment buildings with 15 percent. We submit the application before building.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Thurgau: 29.4 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Thurgau
Electric mobility in the Canton of Thurgau in figures
- Household electricity price 2026
- 29.4ct./kWh
- Median of the grid operators, excluding VAT. 1.7 ct. above the Swiss median (27.7 ct.).
- of passenger cars are electric
- 5.5%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- public charging points
- 451
- Around 25 electric cars per public charging point. Most charging happens at home and at work.
- apartment buildings
- 12,215
- 17.9% of residential buildings (Switzerland 22.7%).
- Solar power per person per year
- 1,511kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 2,818GWh
- Used so far: 17.1% (Switzerland 12.8%).
Example: underground car park with 8 electric cars in the Canton of Thurgau
- Power per car per yeararound 2,700 kWh
- Power for 8 carsaround 21,600 kWh
- Cost with grid power per yeararound CHF 6,350
- Power without load management8 × 11 kW = 88 kW
Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 29.4 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?
Calculate it for our car parkSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charging for underground car parks in the Canton of Thurgau
What applies to your car park in the Canton of Thurgau
Subsidy for the installation in the Canton of Thurgau
The energy subsidy programme 2026 supports the installation of charging infrastructure for passenger cars in apartment buildings and in office and industrial buildings with 15% of the investment cost. The subsidy is between CHF 1,000 and 30,000 per project. It covers the permanently connected electrical infrastructure, but not the EV chargers themselves. The building must have been approved before 2019, and the EV chargers may have at most 22 kW.
Application before implementation begins
The application must arrive before work begins. We fill in the form with you and submit it. Because the canton subsidises the installation, we plan it first: supply cable, distribution and load management that shares the power between the vehicles. For this, we record all parking spaces in the underground car park.
Owners and tenants
In condominium ownership (STWEG), the owners decide according to the Civil Code and their regulations, and in rented properties the landlord agrees. We give the property management a quote that shows the subsidised part and the individual wallboxes separately. This makes clear what the owners’ association bears jointly and which items individual parties take on.
The power limit of 22 kW per EV charger is one of the conditions and is built into the planning. We design the load management so that the property’s connection capacity is sufficient, and we meter each charge point separately for billing per user. Installation and commissioning are carried out by our own installers.
Many small utilities in Thurgau
In the Canton of Thurgau, many small utilities supply their communes. EW Romanshorn charges 24.9 ct./kWh, LST Energie AG 33.2 ct./kWh and Arbon Energie AG 29.3 ct./kWh. The cantonal median is 29.4 ct./kWh, and the Swiss median is 27.7 ct./kWh. The electricity price here depends heavily on the utility, so we calculate with your tariff. We also register the system with that utility before installation, under the Low-Voltage Installation Ordinance (NIV).
Grid operators
Electricity prices 2026 in the Canton of Thurgau
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Frauenfeld | Thurplus | 29.5 |
| Kreuzlingen | Energie Kreuzlingen, Stadt Kreuzlingen | 28.9 |
| Arbon | Arbon Energie AG | 29.3 |
| Amriswil | Regio Energie Amriswil (REA) | 29.4 |
| Weinfelden | Technische Betriebe Weinfelden AG | 31.9 |
| Romanshorn | Genossenschaft EW Romanshorn | 24.9 |
| Aadorf | Elektra Häuslenen | 29.3 |
| Sirnach | EW Sirnach AG | 29.4 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How high is the subsidy in the Canton of Thurgau for charging infrastructure in an apartment building?
15% of the investment cost, at least CHF 1,000 and at most CHF 30,000 per project. The installation is subsidised, not the EV charger.
What does the Canton of Thurgau require of the car park for the subsidy?
The building must have been approved before 2019, and the EV chargers may have at most 22 kW. The application must arrive before implementation begins.
Who deals with the subsidy form in Thurgau?
We fill in the application with you and submit it before the work begins.
Must property management allow every tenant an EV charger?
There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.
Who decides on EV chargers in condominium ownership?
That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.
Is the house connection enough for several electric cars?
Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





