Skip to content

Charging for apartment buildings in the Canton of St. Gallen

EV charging for underground car parks in the Canton of St. GallenConnection and chargers.

St. Gallen subsidises the connection and the EV chargers in existing underground car parks. We check the conditions and submit the application.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in the Canton of St. Gallen: 29.8 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of St. Gallen

Electric mobility in the Canton of St. Gallen in figures

Household electricity price 2026
29.8ct./kWh
Median of the grid operators, excluding VAT. 2.1 ct. above the Swiss median (27.7 ct.).
of passenger cars are electric
5.3%
Switzerland: 5.5%. An EV charger turns solar power into driving power.
public charging points
1,242
Around 14 electric cars per public charging point. Most charging happens at home and at work.
apartment buildings
23,172
19.9% of residential buildings (Switzerland 22.7%).
Solar power per person per year
1,170kWh
Switzerland: 866 kWh.
Solar potential of the roofs per year
4,072GWh
Used so far: 17.0% (Switzerland 12.8%).

Example: underground car park with 8 electric cars in the Canton of St. Gallen

  • Power per car per yeararound 2,700 kWh
  • Power for 8 carsaround 21,600 kWh
  • Cost with grid power per yeararound CHF 6,440
  • Power without load management8 × 11 kW = 88 kW

Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 29.8 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?

Calculate it for our car park

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

EV charging for underground car parks in the Canton of St. Gallen

What applies to your car park in the Canton of St. Gallen

Subsidy for underground car parks in the Canton of St. Gallen

The energy subsidy programme 2025 to 2030 supports charging infrastructure with load management in existing, non-public underground car parks. The connection, including protective devices, is subsidised with CHF 300 per space, at most CHF 25,000 and 35% of the investment cost. On top of this comes CHF 800 per space for at least four operational EV chargers. A single wallbox is not eligible.

Conditions for the application

The building permit for the car park must have become legally binding before 31 December 2020. For mixed use, the residential share must be at least 30%. You submit the application before the work is carried out. A photovoltaic system in the same project is supported with an additional flat rate of CHF 5,000. We clarify these points before the quote and submit the application for you.

Load management and condominium ownership

The programme requires load management that shares and prioritises the total charging power. That is exactly how we plan the charging infrastructure for all spaces. In condominium ownership (STWEG), the owners decide according to the Civil Code and their regulations, and in rented properties the landlord agrees. Since at least four EV chargers are needed, a joint decision that involves several parties at once is advisable.

The minimum of four EV chargers calls for the owners to act together. We record all parking spaces in the car park, agree the number of charge points with the property management and make sure the load management shares the total charging power by priority. Planning and installation are carried out by our own installers.

Grid operators in the Canton of St. Gallen

The St. Gallisch-Appenzellische Kraftwerke supply 15 communes at 29.3 ct./kWh, the St.Galler Stadtwerke are at 30.6 ct./kWh and the Regionalwerk Toggenburg at 24.8 ct./kWh. The cantonal median is 29.8 ct./kWh, against 27.7 ct./kWh for the Swiss median. Before installation, our electrical installer registers the system with the utility, and afterwards issues the safety certificate.

Grid operators

Electricity prices 2026 in the Canton of St. Gallen

What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), centimes per kWh excluding VAT
CommuneGrid operatorct./kWh
St. GallenSt.Galler Stadtwerke30.6
Rapperswil-JonaElektrizitätswerk Jona-Rapperswil AG23.1
WilTechnische Betriebe Wil31.1
GossauStadtwerke Gossau27.9
UzwilSt. Gallisch-Appenzellische Kraftwerke AG29.7
BuchsElektrizitäts- und Wasserwerk der Stadt Buchs (EWB)29.6
AltstättenTechnische Betriebe Altstätten31.2
FlawilTechnische Betriebe Flawil (TBF)27.9
WidnauPolitische Gemeinde Widnau, Elektra / Stromversorgung27.1
RorschachTechnische Betriebe, Stadt Rorschach26.4
EschenbachSt. Gallisch-Appenzellische Kraftwerke AG29.3
WittenbachSt.Galler Stadtwerke29.5
Kirchbergrwt Regionalwerk Toggenburg AG25.1
GoldachTechnische Betriebe Goldach30.5
MelsPolitische Gemeinde Mels, Elektrizitäts- & Wasserwerk26.9

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

How much does the Canton of St. Gallen subsidise charging infrastructure in an underground car park?

CHF 300 per space for the connection, at most CHF 25,000 and 35% of the costs, plus CHF 800 per space for at least four operational EV chargers.

Does St. Gallen give a subsidy for a single wallbox in the car park?

No, a single wallbox is not eligible. You need at least four operational EV chargers with load management.

By when must the underground car park in St. Gallen have been approved?

The building permit must have been issued before 31 December 2020. For newer car parks, we check other options.

Must property management allow every tenant an EV charger?

There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.

Who decides on EV chargers in condominium ownership?

That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.

Is the house connection enough for several electric cars?

Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager