Charging for apartment buildings in the Canton of Graubünden
EV charging for underground car parks in the Canton of GraubündenPower to Garage standard.
Graubünden subsidises charging infrastructure in apartment buildings under the Power to Garage standard. We plan to that standard and submit the application.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Graubünden: 29.2 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Graubünden
Electric mobility in the Canton of Graubünden in figures
- Household electricity price 2026
- 29.2ct./kWh
- Median of the grid operators, excluding VAT. 1.5 ct. above the Swiss median (27.7 ct.).
- of passenger cars are electric
- 4.8%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- public charging points
- 1,129
- Around 6 electric cars per public charging point. Most charging happens at home and at work.
- apartment buildings
- 16,312
- 21.3% of residential buildings (Switzerland 22.7%).
- Solar power per person per year
- 983kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 2,630GWh
- Used so far: 8.7% (Switzerland 12.8%).
Example: underground car park with 8 electric cars in the Canton of Graubünden
- Power per car per yeararound 2,700 kWh
- Power for 8 carsaround 21,600 kWh
- Cost with grid power per yeararound CHF 6,310
- Power without load management8 × 11 kW = 88 kW
Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 29.2 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?
Calculate it for our car parkSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charging for underground car parks in the Canton of Graubünden
What applies to your car park in the Canton of Graubünden
Subsidy under the Power to Garage standard
The Canton of Graubünden subsidises charging infrastructure in existing apartment buildings if it meets the Power to Garage standard. At least four parking bays get shared load management. The subsidy is CHF 400 per parking bay, at most CHF 50,000, and the canton counts at most one parking bay per residential unit. In total, at most 50% of the project costs can be subsidised. The application must arrive before construction starts. We submit it for you and plan the system from the outset according to the canton’s guide.
Bidirectional charging
For a bidirectional DC charger at residential buildings, the canton pays an additional CHF 2,000. We will discuss at the site visit whether this technology suits your building. It only comes into question for individual spaces, and the basic installation for the other parking bays is not affected.
Condominium ownership and rented properties
In condominium ownership (STWEG), the owners decide according to the Civil Code and their regulations. In rented properties, the landlord decides. The load management that the canton requires for the subsidy shares the power between all spaces and, in many cases, keeps the house connection sufficient. Wallboxes can follow one by one, each with its own metering for billing per user.
Because the Power to Garage standard sets requirements for the design, we plan the system to it from the start. This saves rework when the application is reviewed. Planning, installation with our own installers and commissioning are all done from one source.
Grid operators in Graubünden
Repower AG supplies 32 of 100 communes, the Elektrizitätswerk der Stadt Zürich (the city of Zurich’s electricity utility) eight and Rhiienergie five. The cantonal median is 29.2 ct./kWh, which is 1.5 centimes above the Swiss median of 27.7 ct./kWh. At Repower it is 30.6 and at Rhiienergie 25.6 ct./kWh. Before installation, the electrical installer registers the system with the grid operator using an installation notice (Installationsanzeige).
Grid operators
Electricity prices 2026 in the Canton of Graubünden
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Chur | IBC Energie Wasser Chur (IBC) | 29.9 |
| Davos | EWD Elektrizitätswerk Davos AG | 23.7 |
| Landquart | Repower AG | 30.6 |
| Domat/Ems | Rhiienergie AG (rhiienergie) | 25.6 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
What subsidy is there in the Canton of Graubünden for the car park?
CHF 400 per parking bay, at most CHF 50,000, under the Power to Garage standard and with at most one parking bay per residential unit. In total, at most 50% of the project costs can be subsidised.
How many parking bays are needed in Graubünden for the subsidy?
At least four parking bays with shared load management. The building must already exist.
What applies in Graubünden to bidirectional EV chargers?
For a bidirectional DC charger at residential buildings, the canton gives CHF 2,000. We will discuss at the site visit whether this suits your building.
Must property management allow every tenant an EV charger?
There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.
Who decides on EV chargers in condominium ownership?
That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.
Is the house connection enough for several electric cars?
Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





