Charging for apartment buildings in German-speaking Fribourg
EV charging for underground car parks in German-speaking FribourgPlanning for all spaces.
The Fribourg subsidy programme for EV chargers was used up at the end of 2022. Before the quote, we check what is possible for your property today.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in German-speaking Fribourg: 27.3 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in German-speaking Fribourg
Electric mobility in German-speaking Fribourg in figures
- Household electricity price 2026
- 27.3ct./kWh
- Median of the communes, excluding VAT. 0.4 ct. below the Swiss median (27.7 ct.).
- of passenger cars are electric
- 4.7%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- public charging points
- 42
- Around 32 electric cars per public charging point. Most charging happens at home and at work.
- apartment buildings
- 1,576
- 13.1% of residential buildings (Switzerland 22.7%).
- Solar power per person per year
- 1,236kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 505GWh
- Used so far: 11.7% (Switzerland 12.8%).
Example: underground car park with 8 electric cars in German-speaking Fribourg
- Power per car per yeararound 2,700 kWh
- Power for 8 carsaround 21,600 kWh
- Cost with grid power per yeararound CHF 5,900
- Power without load management8 × 11 kW = 88 kW
Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 27.3 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?
Calculate it for our car parkSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charging for underground car parks in German-speaking Fribourg
What applies to your car park in German-speaking Fribourg
Subsidy in German-speaking Fribourg: programme used up
In 2022, the Canton of Fribourg paid contributions for private EV chargers from its energy fund. The budget of one million francs was fully allocated by the end of 2022, and almost 800 applications were approved. We have not found a current cantonal programme for EV chargers for 2026. This applies to the whole canton, and German-speaking Fribourg (Deutschfreiburg) has no rules of its own. Before the quote, we check whether the commune or energy supplier offers a contribution, and we name only documented amounts.
Planning for future electric cars
Where only a few residents drive an electric car today, planning in two stages pays off. The basic installation with supply cable, distribution and load management is designed for all parking spaces. Wallboxes are added as needed, without the supply cable having to be opened up again. This keeps the effort for later additions small.
Property managers and owners’ associations
In condominium ownership (STWEG), the owners decide according to the Civil Code and their regulations. In rented properties, the landlord must agree. We prepare a quote for the meeting that shows the basic installation and the wallboxes separately. The consumption of each charge point is metered separately, and users pay for what they charge.
During the site visit we clarify how much power the property can release for charging. We check the main distribution board, the meter positions and the cable routes, and we record the result in the quote. Planning, installation with our own installers and commissioning are all handled by us, from one source.
Groupe E as grid operator
In all 15 communes of German-speaking Fribourg, Groupe E is the grid operator. The average household price is 27.3 ct./kWh, just below the Swiss median of 27.7 ct./kWh. Because a single utility is responsible, registration follows one procedure. Before installation, our electrical installer submits the technical connection application (technisches Anschlussgesuch) and the installation notice (Installationsanzeige).
Grid operators
Electricity prices 2026 in German-speaking Fribourg
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Grid operator | Communes | ct./kWh |
|---|---|---|
| Groupe E SA | 15 | 27.3 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Does the Canton of Fribourg still subsidise EV chargers in underground car parks?
The 2022 programme was used up at the end of 2022. We have not found a current programme, so we check contributions from communes and energy suppliers.
Do different rules apply in German-speaking Fribourg than in the rest of the Canton of Fribourg?
No. Cantonal law and subsidies apply to the whole canton. We plan in German-speaking Fribourg as we do everywhere else.
How do I plan the car park in German-speaking Fribourg for future electric cars?
With a basic installation (backbone wiring) for all parking spaces and load management. Wallboxes are added as needed, without opening up the supply cable again.
Must property management allow every tenant an EV charger?
There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.
Who decides on EV chargers in condominium ownership?
That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.
Is the house connection enough for several electric cars?
Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





