Skip to content

Charging for apartment buildings in the Canton of Basel-Country

EV charging for underground car parks in the Canton of Basel-CountryCHF 500 per charge point.

Since 2026, the Basel-Country energy package has supported the basic installation in apartment buildings. We check whether your project meets the conditions.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the electricity price in the Canton of Basel-Country: 32.0 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of Basel-Country

Electric mobility in the Canton of Basel-Country in figures

Household electricity price 2026
32.0ct./kWh
Median of the grid operators, excluding VAT. 4.3 ct. above the Swiss median (27.7 ct.).
of passenger cars are electric
5.5%
Switzerland: 5.5%. An EV charger turns solar power into driving power.
public charging points
511
Around 18 electric cars per public charging point. Most charging happens at home and at work.
apartment buildings
12,791
18.6% of residential buildings (Switzerland 22.7%).
Solar power per person per year
718kWh
Switzerland: 866 kWh.
Solar potential of the roofs per year
1,865GWh
Used so far: 13.0% (Switzerland 12.8%).

Example: underground car park with 8 electric cars in the Canton of Basel-Country

  • Power per car per yeararound 2,700 kWh
  • Power for 8 carsaround 21,600 kWh
  • Cost with grid power per yeararound CHF 6,910
  • Power without load management8 × 11 kW = 88 kW

Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 32.0 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?

Calculate it for our car park

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

EV charging for underground car parks in the Canton of Basel-Country

What applies to your car park in the Canton of Basel-Country

Subsidy for underground car parks in the Canton of Basel-Country

Since 1 January 2026, the Basel-Country energy package (Energiepaket) has supported the basic installation, permanently connected to the building, for private charge points. The subsidy is CHF 500 per charge point, at most 50% of the investment cost and at most CHF 100,000 per application. The building must already exist and have at least three residential units. In addition, there must be at least three equipped parking spaces and load management. The wallboxes themselves are not part of the subsidy.

Application and timeline

The application must be submitted before installation starts. We put it together with you and only begin installing afterwards. If you settle the question early with the property management and the owners, you save time, because the owners’ decision and the application can be prepared in parallel. Before the quote, we will tell you about contributions from communes and energy suppliers.

Condominium ownership and rented properties

In condominium ownership (STWEG), the owners decide according to the Civil Code and their regulations. In rented properties, the landlord agrees. The load management that the canton requires shares the power between all spaces. More wallboxes can be added later, and billing is per user. The wallboxes are not part of the subsidised basic installation, so we show the two items separately in the quote.

During the site visit we record the parking spaces, the main distribution board and the cable route. This lets us judge, even before the application, whether at least three spaces can sensibly be equipped and how the load management needs to be set up. Planning and installation by our own installers are handled by us.

Grid operators in Basel-Country

EBL supplies 50 of the 86 communes, Primeo Netz 23 and BKW 8. The cantonal median is 32.0 ct./kWh, which is 4.3 centimes above the Swiss median of 27.7 ct./kWh. Before installation, we register the EV chargers with your grid operator, using the technical connection application (technisches Anschlussgesuch) and the installation notice (Installationsanzeige). The grid operator may set conditions on capacity and load management.

Grid operators

Electricity prices 2026 in the Canton of Basel-Country

What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), centimes per kWh excluding VAT
CommuneGrid operatorct./kWh
AllschwilPrimeo Netz AG32.0
ReinachPrimeo Netz AG32.0
MuttenzPrimeo Netz AG32.0
PrattelnEBL (Genossenschaft Elektra Baselland)30.2
BinningenPrimeo Netz AG32.0
LiestalEBL (Genossenschaft Elektra Baselland)30.2
MünchensteinPrimeo Netz AG32.0
OberwilPrimeo Netz AG32.0
AeschPrimeo Netz AG32.0
BirsfeldenPrimeo Netz AG32.0
TherwilPrimeo Netz AG32.0
ArlesheimPrimeo Netz AG32.0
BottmingenPrimeo Netz AG32.0
SissachGenossenschaft Elektra Sissach27.7
FrenkendorfEBL (Genossenschaft Elektra Baselland)30.2

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

How high is the subsidy in the Canton of Basel-Country for charge points in an underground car park?

CHF 500 per charge point, at most 50% of the investment cost and CHF 100,000 per application. The building needs at least three residential units, plus at least three equipped parking spaces and load management.

Do I have to submit an application in Basel-Country before building?

Yes, the application must be submitted before installation starts. We put it together with you and only begin installing afterwards.

Does the Basel-Country subsidy also cover the wallboxes themselves?

The subsidy covers the basic installation that is permanently connected to the building. Before the quote, we will tell you about contributions from communes and energy suppliers.

Must property management allow every tenant an EV charger?

There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.

Who decides on EV chargers in condominium ownership?

That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.

Is the house connection enough for several electric cars?

Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager