Charging for apartment buildings in the Canton of Basel-Country
EV charging for underground car parks in the Canton of Basel-CountryCHF 500 per charge point.
Since 2026, the Basel-Country energy package has supported the basic installation in apartment buildings. We check whether your project meets the conditions.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Basel-Country: 32.0 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Basel-Country
Electric mobility in the Canton of Basel-Country in figures
- Household electricity price 2026
- 32.0ct./kWh
- Median of the grid operators, excluding VAT. 4.3 ct. above the Swiss median (27.7 ct.).
- of passenger cars are electric
- 5.5%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- public charging points
- 511
- Around 18 electric cars per public charging point. Most charging happens at home and at work.
- apartment buildings
- 12,791
- 18.6% of residential buildings (Switzerland 22.7%).
- Solar power per person per year
- 718kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 1,865GWh
- Used so far: 13.0% (Switzerland 12.8%).
Example: underground car park with 8 electric cars in the Canton of Basel-Country
- Power per car per yeararound 2,700 kWh
- Power for 8 carsaround 21,600 kWh
- Cost with grid power per yeararound CHF 6,910
- Power without load management8 × 11 kW = 88 kW
Guide value, not a quote. Assumptions: 15,000 km per car, 18 kWh per 100 km, electricity price 32.0 ct./kWh excluding VAT. Load management shares the available power across all spaces so the building connection is not overloaded. Billing is per user. More in our guide How much does an EV charger cost?
Calculate it for our car parkSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charging for underground car parks in the Canton of Basel-Country
What applies to your car park in the Canton of Basel-Country
Subsidy for underground car parks in the Canton of Basel-Country
Since 1 January 2026, the Basel-Country energy package (Energiepaket) has supported the basic installation, permanently connected to the building, for private charge points. The subsidy is CHF 500 per charge point, at most 50% of the investment cost and at most CHF 100,000 per application. The building must already exist and have at least three residential units. In addition, there must be at least three equipped parking spaces and load management. The wallboxes themselves are not part of the subsidy.
Application and timeline
The application must be submitted before installation starts. We put it together with you and only begin installing afterwards. If you settle the question early with the property management and the owners, you save time, because the owners’ decision and the application can be prepared in parallel. Before the quote, we will tell you about contributions from communes and energy suppliers.
Condominium ownership and rented properties
In condominium ownership (STWEG), the owners decide according to the Civil Code and their regulations. In rented properties, the landlord agrees. The load management that the canton requires shares the power between all spaces. More wallboxes can be added later, and billing is per user. The wallboxes are not part of the subsidised basic installation, so we show the two items separately in the quote.
During the site visit we record the parking spaces, the main distribution board and the cable route. This lets us judge, even before the application, whether at least three spaces can sensibly be equipped and how the load management needs to be set up. Planning and installation by our own installers are handled by us.
Grid operators in Basel-Country
EBL supplies 50 of the 86 communes, Primeo Netz 23 and BKW 8. The cantonal median is 32.0 ct./kWh, which is 4.3 centimes above the Swiss median of 27.7 ct./kWh. Before installation, we register the EV chargers with your grid operator, using the technical connection application (technisches Anschlussgesuch) and the installation notice (Installationsanzeige). The grid operator may set conditions on capacity and load management.
Grid operators
Electricity prices 2026 in the Canton of Basel-Country
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Allschwil | Primeo Netz AG | 32.0 |
| Reinach | Primeo Netz AG | 32.0 |
| Muttenz | Primeo Netz AG | 32.0 |
| Pratteln | EBL (Genossenschaft Elektra Baselland) | 30.2 |
| Binningen | Primeo Netz AG | 32.0 |
| Liestal | EBL (Genossenschaft Elektra Baselland) | 30.2 |
| Münchenstein | Primeo Netz AG | 32.0 |
| Oberwil | Primeo Netz AG | 32.0 |
| Aesch | Primeo Netz AG | 32.0 |
| Birsfelden | Primeo Netz AG | 32.0 |
| Therwil | Primeo Netz AG | 32.0 |
| Arlesheim | Primeo Netz AG | 32.0 |
| Bottmingen | Primeo Netz AG | 32.0 |
| Sissach | Genossenschaft Elektra Sissach | 27.7 |
| Frenkendorf | EBL (Genossenschaft Elektra Baselland) | 30.2 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
How high is the subsidy in the Canton of Basel-Country for charge points in an underground car park?
CHF 500 per charge point, at most 50% of the investment cost and CHF 100,000 per application. The building needs at least three residential units, plus at least three equipped parking spaces and load management.
Do I have to submit an application in Basel-Country before building?
Yes, the application must be submitted before installation starts. We put it together with you and only begin installing afterwards.
Does the Basel-Country subsidy also cover the wallboxes themselves?
The subsidy covers the basic installation that is permanently connected to the building. Before the quote, we will tell you about contributions from communes and energy suppliers.
Must property management allow every tenant an EV charger?
There is no clear legal entitlement. In practice, many property managers agree if the tenant bears the cost and the solution suits the building. A shared solution for all parking spaces is usually cheaper than many individual installations.
Who decides on EV chargers in condominium ownership?
That depends on the regulations and the scope. Work on shared parts such as the supply line and distribution board usually needs a resolution of the owners' meeting. We provide the documents for the vote.
Is the house connection enough for several electric cars?
Often yes, if load management shares out the power. Then not all cars charge at full power at the same time. We calculate whether the connection is enough using the load data of your building.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





