Wallbox in the Canton of St. Gallen
EV charger in the Canton of St. GallenRegistration included.
The Canton of St. Gallen subsidises charging infrastructure with load management in existing car parks. We plan and install your wallbox and register it.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of St. Gallen: 29.8 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of St. Gallen
Electric mobility in the Canton of St. Gallen in figures
- Household electricity price 2026
- 29.8ct./kWh
- Median of the grid operators, excluding VAT. 2.1 ct. above the Swiss median (27.7 ct.).
- of passenger cars are electric
- 5.3%
- Switzerland: 5.5%. That is around 17,200 electric cars.
- public charging points
- 1,242
- Around 14 electric cars per public charging point. Most charging happens at home and at work.
- Solar power per person per year
- 1,170kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 4,072GWh
- Used so far: 17.0% (Switzerland 12.8%).
- of residential buildings already use a heat pump
- 31.0%
- Switzerland: 26.2%.
Example: charging an electric car at home in the Canton of St. Gallen
- Distance per year15,000 km
- Power per yeararound 2,700 kWh
- Cost with grid power per yeararound CHF 800
- Cost per 100 kmaround CHF 5.40
Guide value, not a quote. Assumptions: 18 kWh per 100 km including charging losses, electricity price 29.8 ct./kWh excluding VAT. With power from your own roof, every kilowatt hour you charge replaces grid power instead of going into the grid for the lower feed-in tariff. More in our guide How much does an EV charger cost?
Calculate it for my homeSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charger in the Canton of St. Gallen
What applies to your EV charger in the Canton of St. Gallen
Connection and permit in the Canton of St. Gallen
A wallbox is an electrical installation under the low-voltage installation ordinance (NIV). We register it with the grid operator before installation. The grid operator may set conditions on power or load management. After installation, we issue the safety certificate. Art. 136 of the Planning and Building Act of the Canton of St. Gallen sets out which projects need a permit. An EV charger at an existing parking space in a garage or carport usually needs no building permit. For new parking spaces, extensions or publicly accessible charging points, we clarify this with your commune.
Subsidies in the Canton of St. Gallen
The energy subsidy programme 2025 to 2030 supports charging infrastructure with load management in existing, non-public car parks. The connection including protective devices is subsidised with CHF 300 per parking space, at most CHF 25,000 and 35% of the investment costs. The condition is at least four operational EV chargers, for which there is CHF 800 per parking space. A photovoltaic system in the same project receives a flat CHF 5,000. The building permit for the car park must have been issued before 31 December 2020. A single wallbox is not eligible.
Motor vehicle tax for electric cars
Since 2026, the Canton of St. Gallen has calculated the charge from total weight and power, regardless of drive technology. The earlier exemption for electric vehicles no longer applies. Vehicles in energy efficiency category A receive a bonus of 50% and those in category B of 25%. The bonus applies in the year of first registration and in the following three years.
Apartment buildings and condominium ownership
Tenants need the landlord’s consent. In condominium ownership, the owners’ association (STWEG) decides. The cantonal programme requires load management that shares and prioritises the total charging power. This is exactly how we plan the charging infrastructure for all spaces. More on this under EV charging in underground car parks.
Grid operator and electricity price
In the Canton of St. Gallen, the St. Gallisch-Appenzellische Kraftwerke supply 15 communes, at 29.3 ct./kWh in household profile H4. The St.Galler Stadtwerke are at 30.6 ct./kWh and the Regionalwerk Toggenburg at 24.8 ct./kWh. The cantonal median is 29.8 ct./kWh and the Swiss median 27.7 ct./kWh (ElCom, the Federal Electricity Commission, 2026, excluding VAT). With a solar system, every kilowatt-hour you charge from your own roof replaces grid electricity.
Grid operators
Electricity prices 2026 in the Canton of St. Gallen
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| St. Gallen | St.Galler Stadtwerke | 30.6 |
| Rapperswil-Jona | Elektrizitätswerk Jona-Rapperswil AG | 23.1 |
| Wil | Technische Betriebe Wil | 31.1 |
| Gossau | Stadtwerke Gossau | 27.9 |
| Uzwil | St. Gallisch-Appenzellische Kraftwerke AG | 29.7 |
| Buchs | Elektrizitäts- und Wasserwerk der Stadt Buchs (EWB) | 29.6 |
| Altstätten | Technische Betriebe Altstätten | 31.2 |
| Flawil | Technische Betriebe Flawil (TBF) | 27.9 |
| Widnau | Politische Gemeinde Widnau, Elektra / Stromversorgung | 27.1 |
| Rorschach | Technische Betriebe, Stadt Rorschach | 26.4 |
| Eschenbach | St. Gallisch-Appenzellische Kraftwerke AG | 29.3 |
| Wittenbach | St.Galler Stadtwerke | 29.5 |
| Kirchberg | rwt Regionalwerk Toggenburg AG | 25.1 |
| Goldach | Technische Betriebe Goldach | 30.5 |
| Mels | Politische Gemeinde Mels, Elektrizitäts- & Wasserwerk | 26.9 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Is there a subsidy for a wallbox in the Canton of St. Gallen?
There is no cantonal contribution for a single wallbox, as it does not count as charging infrastructure under the programme. The subsidy covers charging infrastructure with load management in existing car parks, if at least four EV chargers are installed.
Do I pay less motor vehicle tax for an electric car in the Canton of St. Gallen?
The earlier exemption has been abolished since 2026. The charge is based on total weight and power. Vehicles in energy efficiency category A receive a 50% bonus and those in category B a 25% bonus, in the year of first registration and in the following three years.
Which car parks does the Canton of St. Gallen subsidise for EV chargers?
Existing, non-public car parks with a building permit that became legally binding before 31 December 2020. For mixed use, the residential share must be at least 30%. The application must be submitted before implementation.
Do I need a building permit for the EV charger in the Canton of St. Gallen?
Usually not for a private wallbox at an existing parking space. For new parking spaces, extensions or publicly accessible charging points, we clarify this with your commune.
Do I need a three-phase power connection for a wallbox?
An 11 kW wallbox runs on a three-phase connection with 16 amps. Most houses have one. However, it often needs its own supply line and a protective device in the distribution board. We check during the site visit whether your installation is sufficient.
Can I connect the wallbox myself?
No. In Switzerland, only a licensed electrician may carry out the fixed connection. They also issue the safety certificates that the grid operator and the insurer require.
How long does it take to install an EV charger?
With a short cable route, usually half a day to a full day. If we have to run a cable through a wall, garden or garage, it takes longer. We tell you the duration beforehand in the quote.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
EV charger in your commune
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





