Wallbox in the Canton of Nidwalden
EV charger in the Canton of NidwaldenPower from 22.1 ct.
In Nidwalden, the cantonal median for household electricity is 5.6 centimes below the Swiss median. We install your wallbox and register it with EWN.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Nidwalden: 22.1 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Nidwalden
Electric mobility in the Canton of Nidwalden in figures
- Household electricity price 2026
- 22.1ct./kWh
- Median of the grid operators, excluding VAT. 5.6 ct. below the Swiss median (27.7 ct.).
- of passenger cars are electric
- 5.8%
- Switzerland: 5.5%. That is around 1,800 electric cars.
- public charging points
- 131
- Around 14 electric cars per public charging point. Most charging happens at home and at work.
- Solar power per person per year
- 777kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 253GWh
- Used so far: 14.0% (Switzerland 12.8%).
- of residential buildings already use a heat pump
- 32.0%
- Switzerland: 26.2%.
Example: charging an electric car at home in the Canton of Nidwalden
- Distance per year15,000 km
- Power per yeararound 2,700 kWh
- Cost with grid power per yeararound CHF 600
- Cost per 100 kmaround CHF 4.00
Guide value, not a quote. Assumptions: 18 kWh per 100 km including charging losses, electricity price 22.1 ct./kWh excluding VAT. With power from your own roof, every kilowatt hour you charge replaces grid power instead of going into the grid for the lower feed-in tariff. More in our guide How much does an EV charger cost?
Calculate it for my homeSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charger in the Canton of Nidwalden
What applies to your EV charger in the Canton of Nidwalden
Connection and permit in the Canton of Nidwalden
A wallbox is an electrical installation under the low-voltage installation ordinance. The electrician registers it with the grid operator by means of an installation notice. The grid operator may ask for a connection application and set conditions on power and load management. We handle the registration with our own installers and issue the safety certificate after installation.
In the Canton of Nidwalden, a building permit is not needed in most cases for EV chargers at existing parking spaces of single-family homes and apartment buildings. There are exceptions if the installation has a major impact on the surroundings or access. New parking spaces need a building permit. The commune assesses whether a permit is required, so we clarify each case with it before installation.
Subsidies in the Canton of Nidwalden
The energy subsidy programme 2026 of the Nidwalden energy office supports building envelopes, replacing your heating system, solar thermal systems, new buildings and consultations. EV chargers are not listed. We therefore know of no cantonal contribution. Individual communes or EWN may make their own offers. We check this for your location, and we name no amounts that we cannot back up with a source. As long as no contribution is confirmed, we prepare your quote without a subsidy.
Apartment buildings and condominium ownership
Tenants need the landlord’s consent. In condominium ownership, the owners’ association (STWEG) decides. With around 3,000 apartment buildings, Nidwalden has many buildings where several spaces are retrofitted. Load management shares the power between all spaces so that the house connection does not need to be reinforced. We prepare a quote that you can present to the property management or the owners’ meeting. More on this under EV charging in underground car parks.
Grid operator and electricity price
In the Canton of Nidwalden, the Kantonales Elektrizitätswerk Nidwalden (EWN) supplies ten of the eleven communes and the Gemeindewerk Beckenried one. The cantonal median is 22.1 ct./kWh, which is 5.6 centimes below the Swiss median of 27.7 ct./kWh (ElCom, the Federal Electricity Commission, 2026, household profile H4, excluding VAT). In Beckenried the tariff is 26.3 ct./kWh. With a solar system, every kilowatt-hour you charge from your own roof replaces grid electricity.
Grid operators
Electricity prices 2026 in the Canton of Nidwalden
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Grid operator | Communes | ct./kWh |
|---|---|---|
| Kantonales Elektrizitätswerk Nidwalden (EWN) | 10 | 22.1 |
| Gemeindewerk Beckenried | 1 | 26.3 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Do I need a building permit for a wallbox in the Canton of Nidwalden?
Usually not at an existing parking space. There are exceptions for large installations or new parking spaces. We clarify this with your commune before installation.
Is there a subsidy for an EV charger in the Canton of Nidwalden?
The canton's energy subsidy programme 2026 lists building envelopes, heating, solar thermal systems, new buildings and consultations. EV chargers are not listed there. Communes or the utility may have their own offers, and we check this for you.
What is the electricity price for charging in the Canton of Nidwalden?
The cantonal median is 22.1 ct./kWh excluding VAT. EWN supplies ten of the eleven communes at this tariff, and Beckenried is at 26.3 ct./kWh.
Do I need a three-phase power connection for a wallbox?
An 11 kW wallbox runs on a three-phase connection with 16 amps. Most houses have one. However, it often needs its own supply line and a protective device in the distribution board. We check during the site visit whether your installation is sufficient.
Can I connect the wallbox myself?
No. In Switzerland, only a licensed electrician may carry out the fixed connection. They also issue the safety certificates that the grid operator and the insurer require.
How long does it take to install an EV charger?
With a short cable route, usually half a day to a full day. If we have to run a cable through a wall, garden or garage, it takes longer. We tell you the duration beforehand in the quote.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
EV charger in your commune
Communes in the Canton of Nidwalden
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





