Wallbox in the Canton of Basel-Country
EV charger in the Canton of Basel-CountryWallbox and registration.
Since 2026, the Basel-Country energy package (Energiepaket) pays contributions towards the basic installation in apartment buildings. We install your wallbox and register it with the grid operator.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Basel-Country: 32.0 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Basel-Country
Electric mobility in the Canton of Basel-Country in figures
- Household electricity price 2026
- 32.0ct./kWh
- Median of the grid operators, excluding VAT. 4.3 ct. above the Swiss median (27.7 ct.).
- of passenger cars are electric
- 5.5%
- Switzerland: 5.5%. That is around 9,400 electric cars.
- public charging points
- 511
- Around 18 electric cars per public charging point. Most charging happens at home and at work.
- Solar power per person per year
- 718kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 1,865GWh
- Used so far: 13.0% (Switzerland 12.8%).
- of residential buildings already use a heat pump
- 20.1%
- Switzerland: 26.2%.
Example: charging an electric car at home in the Canton of Basel-Country
- Distance per year15,000 km
- Power per yeararound 2,700 kWh
- Cost with grid power per yeararound CHF 860
- Cost per 100 kmaround CHF 5.80
Guide value, not a quote. Assumptions: 18 kWh per 100 km including charging losses, electricity price 32.0 ct./kWh excluding VAT. With power from your own roof, every kilowatt hour you charge replaces grid power instead of going into the grid for the lower feed-in tariff. More in our guide How much does an EV charger cost?
Calculate it for my homeSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
EV charger in the Canton of Basel-Country
What applies to your EV charger in the Canton of Basel-Country
Connection and permit in the Canton of Basel-Country
We register a wallbox with the grid operator before installation. In Basel-Country this is usually EBL or Primeo. This includes the technical connection application and the installation notice. The grid operator may set conditions on power or load management. A building permit is usually not needed for a private EV charger at an existing parking space. For new parking spaces, outdoor charging posts or commercial use, we clarify the position with your commune.
Subsidies in the Canton of Basel-Country
Since 1 January 2026, the Basel-Country energy package has supported the basic installation that is permanently connected to the building for private charging points. The contribution is CHF 500 per charging point, at most 50% of the investment costs and at most CHF 100,000 per application. The conditions are an existing building with at least three dwellings, at least three equipped parking spaces and load management. The application must be submitted before installation starts. We have found no cantonal programme for single-family homes. We check for contributions from communes and energy suppliers.
Motor vehicle tax for electric cars
For purely electric passenger cars, the Executive Council states a tax reduction of CHF 450. It applies in the year of first registration and in the following three years. The Office for Motor Vehicles (Amt für Motorfahrzeuge) confirms the amount for your vehicle.
Apartment buildings and condominium ownership
Basel-Country has many apartment buildings with garage spaces. Tenants need the landlord’s consent. In condominium ownership, the owners’ association (STWEG) decides. Load management is mandatory for the contribution. It shares the power between all spaces, and more wallboxes can be added later. More on this under EV charging in underground car parks.
Grid operator and electricity price
EBL supplies 50 of the 86 communes, Primeo Netz 23 and BKW 8. The cantonal median for households is 32.0 centimes per kilowatt-hour, which is 4.3 centimes above the Swiss median of 27.7 centimes. If you charge with your own solar power, you replace expensive grid electricity. If you wish, we plan the wallbox together with a solar system.
Grid operators
Electricity prices 2026 in the Canton of Basel-Country
What power from the grid costs is set by your grid operator. It sets what a trip by electric car costs when you charge at home. With power from your own roof you charge for less.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Allschwil | Primeo Netz AG | 32.0 |
| Reinach | Primeo Netz AG | 32.0 |
| Muttenz | Primeo Netz AG | 32.0 |
| Pratteln | EBL (Genossenschaft Elektra Baselland) | 30.2 |
| Binningen | Primeo Netz AG | 32.0 |
| Liestal | EBL (Genossenschaft Elektra Baselland) | 30.2 |
| Münchenstein | Primeo Netz AG | 32.0 |
| Oberwil | Primeo Netz AG | 32.0 |
| Aesch | Primeo Netz AG | 32.0 |
| Birsfelden | Primeo Netz AG | 32.0 |
| Therwil | Primeo Netz AG | 32.0 |
| Arlesheim | Primeo Netz AG | 32.0 |
| Bottmingen | Primeo Netz AG | 32.0 |
| Sissach | Genossenschaft Elektra Sissach | 27.7 |
| Frenkendorf | EBL (Genossenschaft Elektra Baselland) | 30.2 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Is there a subsidy for a wallbox in the Canton of Basel-Country?
The Basel-Country energy package subsidises the basic installation for private charging points in existing apartment buildings with three or more dwellings, with CHF 500 per charging point. We have found no cantonal programme for single-family homes.
Do I pay less motor vehicle tax for an electric car in the Canton of Basel-Country?
According to the Executive Council's announcement, purely electric passenger cars receive a reduction of CHF 450 in the year of first registration and in the following three years. The Office for Motor Vehicles (Amt für Motorfahrzeuge) will tell you the exact amount for your vehicle.
Do I need a building permit for the wallbox in the Canton of Basel-Country?
Usually not for a private wallbox at an existing parking space. A permit may be needed for new parking spaces or commercial use. We clarify this with your commune beforehand.
Do I need a three-phase power connection for a wallbox?
An 11 kW wallbox runs on a three-phase connection with 16 amps. Most houses have one. However, it often needs its own supply line and a protective device in the distribution board. We check during the site visit whether your installation is sufficient.
Can I connect the wallbox myself?
No. In Switzerland, only a licensed electrician may carry out the fixed connection. They also issue the safety certificates that the grid operator and the insurer require.
How long does it take to install an EV charger?
With a short cable route, usually half a day to a full day. If we have to run a cable through a wall, garden or garage, it takes longer. We tell you the duration beforehand in the quote.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
Locations
EV charger in your commune
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





