Skip to content

Photovoltaics for businesses in the Canton of Schwyz

Commercial solar in the Canton of SchwyzNotify via eBau.

In the Canton of Schwyz, you notify roof systems of businesses via ebau-sz.ch, and in commercial zones facades too. We handle the documents and send your quote within 72 hours. Our location in the Canton of Schwyz: Oberdorfstrasse 61, 8853 Lachen.

  • Site visit: free and with no obligation
  • Binding quote within 72 hours
  • Calculated with the business tariff in the Canton of Schwyz: 26.6 ct./kWh

Prefer to talk?044 980 08 80

Request a free site visit

Takes 1 minute. No obligation.

  1. Building
  2. Location
  3. Contact
1 What kind of building is it?
2 Where is the building?
3 How can we reach you?

We get back to you within one working day. Your data stays with us.

documented reference systems
29
output of these systems
718.1kWp
to a binding quote
72h
is what the site visit costs
0CHF
  • Member of
  • smart-me
    Partner 2025

Data in the Canton of Schwyz

Solar power for businesses in the Canton of Schwyz

Electricity price 2026 for small businesses
26.6ct./kWh
Category C2 (30,000 kWh a year), excluding VAT. 1.5 ct. above the Swiss median (25.1 ct.).
Household electricity price 2026
28.2ct./kWh
Median of the grid operators, excluding VAT. 0.5 ct. above the Swiss median (27.7 ct.).
Solar potential of the roofs per year
1,061GWh
Used so far: 13.5% (Switzerland 12.8%).
Solar potential of the façades per year
401GWh
Façades yield less than roofs, but more in winter.
Solar power per person per year
757kWh
Switzerland: 866 kWh.
hailstones are to be expected about every 50 years
3.5cm
Typical value of the communes according to MeteoSwiss. Important for choosing modules and for insurance.

Example: 100 kWp system on a commercial roof in the Canton of Schwyz

  • Yield per yeararound 100,000 kWh
  • Used in the business (50%)50,000 kWh
  • Grid power saved per yeararound CHF 13,300
  • Federal one-off paymentaround CHF 31,800

Guide value, not a quote. Assumptions: 1,000 kWh per kWp, a business that uses power during the day, electricity price 26.6 ct./kWh excluding VAT (category C2). Large businesses often have their own tariffs. We calculate with your load profile. More in our guide How much does a solar system cost?

Calculate it for my business

Sources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).

Commercial solar in the Canton of Schwyz

What applies to businesses with a solar system in the Canton of Schwyz

Rules for businesses in the Canton of Schwyz

Under Art. 18a RPG, solar systems on roofs in building and agricultural zones that are sufficiently well integrated need no building permit. In the Canton of Schwyz, you notify the system online via ebau-sz.ch as a building notification for a minor project, at least 20 days before work starts. The notification procedure applies to main buildings and ancillary buildings. In industrial and commercial zones and in zones for public buildings, it also applies to facade systems. For facade systems on buildings over 11 metres high, a fire safety concept is needed.

Fire safety deserves a look for businesses: even a system that only needs to be notified requires a fire safety permit in the Canton of Schwyz. The notification procedure does not apply to protected buildings, to monuments of national or regional importance and in ISOS-A townscapes. A permit under the simplified or ordinary procedure is then needed. We prepare the documents for the notification and fire safety.

For new buildings, requirements for solar or self-generated electricity may apply, depending on size and use. During planning we clarify which rule applies to your project.

Subsidies and one-off payment

The federal government pays the one-off payment (Einmalvergütung) through Pronovo, graded by system size. We submit the application and, on request, pre-finance the subsidies. The Canton of Schwyz does not subsidise photovoltaic systems directly. Its subsidy programmes cover the building envelope and heating systems. Some communes have their own programmes, for example the commune of Schwyz supports battery storage. For depreciation in business assets, your tax adviser can advise you.

Self-consumption in your business

From Freienbach on Lake Zurich to Einsiedeln, locations and altitudes differ. At higher altitudes, snow load and roof pitch play a bigger role, which we check at the site visit. Businesses that use power during the day use a large share of the solar power directly. We read out your load profile data and size the system accordingly. A battery storage unit or EV chargers for the vehicle fleet raise self-consumption.

Grid operators

Electricity prices 2026 in the Canton of Schwyz

What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.

Household using 4,500 kWh a year (category H4), centimes per kWh excluding VAT
CommuneGrid operatorct./kWh
FreienbachEW Höfe AG25.8
EinsiedelnEKZ Einsiedeln AG, Dietikon26.4
Schwyzebs Energie AG26.3
KüssnachtEWS AG28.2
ArthGemeindewerke Arth Elektrizitäts- und Wasserwerk31.3
SchübelbachGemeinde Schübelbach, Elektroversorgung34.3
IngenbohlEWS AG28.2
LachenEW Lachen AG36.9
WollerauEW Höfe AG25.8
AltendorfElektrizitätsversorgung Altendorf AG33.1
FeusisbergElektrizitätswerk Schindellegi25.7
WangenGemeinde Wangen SZ, Elektrizitätswerk33.5
GalgenenGemeinde Galgenen, Elektrizitätsversorgung33.4

Source: ElCom, Federal Electricity Commission, tariffs 2026.

The free site visit

One appointment at your home. Then you know everything.

A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.

  1. A project manager measures the area of a tiled roof.
    01

    Roof

    Area, orientation, pitch, condition of the roof covering and shading.

  2. A project manager explains the distribution board to the homeowner.
    02

    Electrical system

    Grid connection, distribution board and space for inverter and battery.

  3. Project manager talking to a couple in front of their home.
    03

    Your consumption

    Electricity bill, car, heating, plans. From this we calculate yield and subsidies.

How your project runs

  1. Request

    Tell us briefly about your building and your goal. Online or by phone.

  2. Site visit

    We check your roof, electrical system and consumption at your home. Free of charge.

  3. Quote in 72 hours

    Binding and transparent, with yield, subsidies and payback.

  4. Permit and subsidies

    We handle the notification procedure, the grid operator and Pronovo.

  5. Installation and commissioning

    Our own installers, a fixed date, final inspection with you on the roof.

Request your free site visit

Step 1 takes one minute. We take care of the rest.

Google reviews

What our customers say about us.

Unabridged and unedited, straight from our Google profile. The reviews are in German.

All reviews on Google
  • Wir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.

    Cemil B. · October 2026

  • Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.

    Daniel · August 2026

  • Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!

    Frederic L. · September 2025

  • Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.

    Alex I. · August 2025

  • Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!

    Marc W. · August 2025

Built near you.

29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.

Oberbüren: 93.1 kWp, On-roof, flat roof, 2026 (Photos)Wangen: 149.9 kWp, On-roof, pitched roof, 2025 (Photos)Rüti: 41.1 kWp, In-roof, pitched roof, 2026 (Photos)Wagen: 28.2 kWp, On-roof, flat roof, 2025 (Photos)Siebnen: 26.6 kWp, On-roof, flat roof, 2026 (Photos)Zürich: 26.6 kWp, On-roof, flat roof, 2025 (Photos)Staffelbach: 16 kWp, On-roof, pitched roof, 2025 (Photos)Zürich: 6.8 kWp, On-roof, flat roof, 2025 (Photos)Reinach AG: 20.7 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Zürich: 10.9 kWp, On-roof, flat roof, 2025 (Photos)Berikon: 19.8 kWp, On-roof, pitched roof, 2025 (Photos)Meggen: 16.6 kWp, On-roof, flat roof, battery storage, backup power, 2025 (Photos)Gossau ZH: 7.7 kWp, On-roof, flat roof, 2025 (Photos)Zollikerberg: 17.7 kWp, On-roof, pitched roof, 2025 (Photos)Ebmatingen: 16.9 kWp, On-roof, pitched roof, battery storage, replacement heat pump, 2024 (Photos)Ebmatingen: 17 kWp, On-roof, pitched roof, battery storage, backup power, 2025Zürich: 7.5 kWp, On-roof, flat roof, 2024 (Photos)Maur: 6.9 kWp, On-roof, pitched roof, 2024 (Photos)Oberkulm: 20.7 kWp, On-roof, pitched roof, battery storage, 2024Benken: 18 kWp, On-roof, flat roof, battery storage, 2025 (Photos)Herrliberg: 14.8 kWp, In-roof, pitched roof, 2024Herrliberg: 12 kWp, In-roof, pitched roof, 2025 (Photos)Freienbach: 29 kWp, In-roof, pitched roof, 2024 (Photos)Jona: 20.2 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Rapperswil-Jona: 13.7 kWp, On-roof, pitched roof, battery storage, 2024 (Photos)Meilen: 17.2 kWp, In-roof, pitched roof, battery storage, 2025 (Photos)Buonas: 17 kWp, On-roof, pitched roof, 2025 (Photos)Uznach: 15.5 kWp, On-roof, pitched roof, 2026 (Photos)Bachs: 10.2 kWp, In-roof, pitched roof, 2026ZumikonLachen
Reference systemOur locations in Zumikon and LachenFocus ZH, SG, SZ, AG

Frequently asked questions

Before you get in touch.

Your question is not listed?

044 980 08 80info@solarinnovation.ch
Is the site visit really free?

Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.

Can I notify a facade system on a workshop hall in the Canton of Schwyz?

In industrial and commercial zones and in zones for public buildings, the notification procedure also applies to facade systems. For buildings over 11 metres high, a fire safety concept is needed.

Which documents does the Canton of Schwyz require to notify a commercial system?

Among others, a site plan with fire brigade plan, roof plan, roof section and the technical data of the modules. The notification must be submitted via ebau-sz.ch at least 20 days before work starts. We prepare the documents.

Does the Canton of Schwyz give contributions to commercial photovoltaics?

The canton does not subsidise photovoltaic systems directly; its programmes cover the building envelope and heating systems. The federal government pays the one-off payment (Einmalvergütung). Some communes have their own programmes, which we check when preparing the quote.

How large a roof does a commercial system need?

A rule of thumb: each kWp needs around 5 to 6 m² of module area. Commercial systems often start at 30 kWp and go well beyond. We measure what fits on your roof at the site visit.

How high is self-consumption in a business?

That depends on the business. If you work during the day, you often use a large share of the solar power directly. Businesses with cooling, machinery or ventilation in the daytime usually do better than offices. We read out your load profile data for this.

Can a solar system reduce peak loads?

In part. Solar power peaks at midday, but demand peaks can also occur in the morning or evening. A commercial battery with controls can cut peaks. We calculate beforehand whether that brings anything under your tariff.

Which regions do you cover?

All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.

The first step

We come to you. Free of charge.

We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.

  • Free and with no obligation
  • Quote within 72 hours
  • Subsidies pre-financed on request
Zarko Mitrovic, solar project manager, on a flat roof with the project documents.
Zarko MitrovicSolar project manager