Home battery in the Canton of Lucerne
Battery storage in the Canton of LucerneStorage in Lucerne.
The Lucerne energy subsidy programme 2026 lists no subsidy for battery storage. We calculate openly whether a battery pays off for your home.
- Site visit: free and with no obligation
- Binding quote within 72 hours
- Calculated with the electricity price in the Canton of Lucerne: 25.4 ct./kWh
Prefer to talk?044 980 08 80
Request a free site visit
Takes 1 minute. No obligation.
- Building
- Location
- Contact
Thank you. We have your request.
We will call you within one working day to arrange the appointment.
Add details Optional
Prefer to talk now? 044 980 08 80
- documented reference systems
- 29
- output of these systems
- 718.1kWp
- to a binding quote
- 72h
- is what the site visit costs
- 0CHF
- Member of
smart-me
Partner 2025
Data in the Canton of Lucerne
Solar power in the Canton of Lucerne in figures
- Household electricity price 2026
- 25.4ct./kWh
- Median of the grid operators, excluding VAT. 2.3 ct. below the Swiss median (27.7 ct.).
- Solar power per person per year
- 1,242kWh
- Switzerland: 866 kWh.
- Solar potential of the roofs per year
- 3,326GWh
- Used so far: 17.9% (Switzerland 12.8%).
- of passenger cars are electric
- 5.8%
- Switzerland: 5.5%. An EV charger turns solar power into driving power.
- of residential buildings already use a heat pump
- 36.5%
- Switzerland: 26.2%.
- of residential buildings heat with oil or gas
- 38.7%
- Switzerland: 49.8%. A heat pump raises the self-consumption of your solar power.
Example: 10 kWp system with battery storage in the Canton of Lucerne
- Self-consumed without battery (30%)3,000 kWh
- Self-consumed with battery (60%)6,000 kWh
- Additionally self-consumed3,000 kWh
- Value at the grid pricearound CHF 760 a year
Guide value, not a quote. Assumptions: 10,000 kWh yield, battery around 10 kWh, electricity price 25.4 ct./kWh excluding VAT. Deduct the feed-in tariff you would otherwise have received for this power. Whether a battery pays off, we calculate with your consumption. More in our guide How much does a solar system cost?
Calculate a battery for meSources: ElCom (electricity prices 2026), Swiss Federal Office of Energy (solar potential), Energie Reporter by geoimpact on behalf of SwissEnergy (solar power, electric cars; CC BY 4.0), Federal Statistical Office (Register of Buildings and Dwellings), MeteoSwiss (hail climate), Energy Promotion Ordinance (one-off payment).
Battery storage in the Canton of Lucerne
What applies to your battery storage in the Canton of Lucerne
Subsidies for battery storage in the Canton of Lucerne
The 2026 energy subsidy programme of the Canton of Lucerne covers the building envelope, heat pumps and other measures, including photovoltaics. The programme overview from Energie Zentralschweiz does not list battery storage. For the solar system, the federal one-off payment (Einmalvergütung, EIV) through Pronovo applies. It supports modules, not the battery. We check contributions from individual communes or energy suppliers for your address and only name documented amounts.
For tax, photovoltaic systems on existing buildings in the Canton of Lucerne count as deductible energy-saving investments. Within three years of a building’s construction this is excluded. We found no separate statement on batteries in the tax manual. Clarify the deduction in advance with the tax office.
Registration and fire protection
Industry and federal rules apply to the battery. The fire protection leaflet for lithium-ion batteries from the VKF (Swiss association of cantonal fire insurers) classifies storage by energy content. Home batteries up to 15 kWh per fire compartment count as small systems, up to 100 kWh as medium ones. A licensed electrical installation company carries out the installation. We register the battery with the system at the grid operator and choose the location at the site visit.
When a battery pays off in the Canton of Lucerne
In the Canton of Lucerne, electricity prices are below the Swiss average. That reduces the advantage of a battery, because the gap to the feed-in tariff may be smaller. A battery is then more likely to pay off if consumption outside the midday hours is high. This often applies to households with a heat pump or an electric car, especially in suburban communes such as Kriens, Emmen or Horw with many single-family homes.
We calculate the system with the tariff of your grid operator and present the quote with and without a battery. You decide based on the figures. You can find more on the system and its costs in our guide, cost of a solar system.
Grid operators
Electricity prices 2026 in the Canton of Lucerne
What power from the grid costs is set by your grid operator. The more expensive grid power is, the more every kilowatt hour you use from your own roof is worth.Swiss median: 27.7 ct./kWh.
| Commune | Grid operator | ct./kWh |
|---|---|---|
| Luzern | CKW AG | 26.2 |
| Emmen | CKW AG | 25.3 |
| Kriens | CKW AG | 25.4 |
| Horw | CKW AG | 25.3 |
| Ebikon | CKW AG | 25.4 |
| Sursee | CKW AG | 25.4 |
| Hochdorf | WWZ Energie AG | 22.8 |
| Willisau | CKW AG | 25.3 |
| Malters | Steiner Energie AG | 28.6 |
| Rothenburg | CKW AG | 25.4 |
| Meggen | CKW AG | 25.4 |
| Reiden | CKW AG | 25.4 |
| Ruswil | CKW AG | 25.4 |
| Neuenkirch | CKW AG | 25.3 |
| Beromünster | CKW AG | 25.4 |
Source: ElCom, Federal Electricity Commission, tariffs 2026.
The free site visit
One appointment at your home. Then you know everything.
A project manager from our team visits you and checks three things. No sales show, no obligation. Afterwards you receive a binding quote with yield, subsidies and payback.
01Roof
Area, orientation, pitch, condition of the roof covering and shading.
02Electrical system
Grid connection, distribution board and space for inverter and battery.
03Your consumption
Electricity bill, car, heating, plans. From this we calculate yield and subsidies.
How your project runs
Request
Tell us briefly about your building and your goal. Online or by phone.
Site visit
We check your roof, electrical system and consumption at your home. Free of charge.
Quote in 72 hours
Binding and transparent, with yield, subsidies and payback.
Permit and subsidies
We handle the notification procedure, the grid operator and Pronovo.
Installation and commissioning
Our own installers, a fixed date, final inspection with you on the roof.
Step 1 takes one minute. We take care of the rest.
Google reviews
What our customers say about us.
5.0
Unabridged and unedited, straight from our Google profile. The reviews are in German.
All reviews on GoogleWir sind sehr zufrieden mit unserer Wallbox für unser E-Auto.
Cemil B. · October 2026
Wir können Solarinnovation.ch und insbesondere Jordan für seine kompetente Beratung und perfekte Umsetzung als zuverlässigen Partner für nachhaltige Energielösungen aus einer Hand von Herzen weiterempfehlen. Er hat uns mit seinem umfangreichen Fachwissen von der ersten Beratung bis und mit der Umsetzung kompetent begleitet. Er hat alle Fragen immer verständlich erklärt. Wir sind mit der Indach-Solaranlage, kombiniert mit einem Speicher sehr zufrieden.
Daniel · August 2026
Die SolarInnovation GmbH hat mich durch ihre sehr flexible und kompetente Beratung und Arbeitsausführung sehr überzeugt!
Frederic L. · September 2025
Eine sehr seriöses Firma. Danke Aulson, Danke Jorden.
Alex I. · August 2025
Top Service und super Beratung! Unsere Solaranlage am linken Zürichseeufer läuft perfekt, produziert mehr Strom als erwartet und sieht auch noch toll aus. Absolut empfehlenswert!
Marc W. · August 2025
Built near you.
29 projects, 718.1 kWp in total. From Zumikon and Lachen we work all over German-speaking Switzerland, most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau.
Canton of Zurich
- Rüti41.1 kWp
- Zürich26.6 kWp
- Zürich6.8 kWp
- Zürich10.9 kWp
- Gossau ZH7.7 kWp
- Zollikerberg17.7 kWp
- Ebmatingen16.9 kWp
- Ebmatingen17 kWp
- Zürich7.5 kWp
- Maur6.9 kWp
- Herrliberg14.8 kWp
- Herrliberg12 kWp
- Meilen17.2 kWp
- Bachs10.2 kWp
Canton of St. Gallen
Canton of Schwyz
Canton of Aargau
- Staffelbach16 kWp
- Reinach AG20.7 kWp
- Berikon19.8 kWp
- Oberkulm20.7 kWp
Canton of Lucerne
Canton of Zug
Frequently asked questions
Before you get in touch.
Is the site visit really free?
Yes. The visit and the quote cost you nothing and commit you to nothing. You only decide once you hold the binding quote in your hands.
Is a battery subsidised in the Canton of Lucerne?
The 2026 energy subsidy programme, which Energie Zentralschweiz presents for Lucerne, lists insulation, heat pumps and photovoltaics, but not battery storage. Whether your commune or utility pays anything, we check when preparing the quote.
Does a battery need a separate permit in the Canton of Lucerne?
A separate building permit is generally not needed. The battery is registered with the grid operator together with the solar system, and a licensed electrical installation company carries out the work. We handle this.
When does a battery pay off for my house in Lucerne, Kriens or Emmen?
If you use a lot of electricity in the evening and at night and your utility's feed-in tariff is low. Each stored kilowatt-hour then replaces grid electricity. We work through your consumption profile and put the options with and without a battery side by side.
How large does the battery storage need to be?
As a rule of thumb, about 1 kWh of storage capacity per 1 kWp of solar output, usually 8 to 15 kWh for single-family homes. What matters is your consumption in the evening and at night. We read it from your electricity bills and calculate the right size.
Is a battery financially worthwhile?
That depends on the electricity price, the feed-in tariff of your grid operator and the price of the battery. The lower the feed-in tariff, the more each kilowatt-hour you use yourself is worth. In the quote, we calculate both options, with and without a battery, side by side.
How long does a battery last?
Modern lithium iron phosphate batteries are designed for several thousand charge cycles, which often means 10 to 15 years or more. Warranty terms differ by manufacturer. We state them in the quote.
Which regions do you cover?
All of German-speaking Switzerland. We build most often in the cantons of Zurich, St. Gallen, Schwyz and Aargau. Our locations are in Zumikon ZH and Lachen SZ.
From one company
Goes well with
The first step
We come to you. Free of charge.
We check your roof, electrical system and consumption. Afterwards you know what is possible on your roof, what it costs and which subsidies you receive. The binding quote follows within 72 hours.
- Free and with no obligation
- Quote within 72 hours
- Subsidies pre-financed on request





